Repair of technical infrastructure for business development in degraded area, Stage 2 (Q3056758)

From EU Knowledge Graph
Revision as of 20:07, 25 November 2021 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in fr: translated_label)
Jump to navigation Jump to search
Project Q3056758 in Latvia
Language Label Description Also known as
English
Repair of technical infrastructure for business development in degraded area, Stage 2
Project Q3056758 in Latvia

    Statements

    0 references
    0 references
    0 references
    1,068,596.78 Euro
    0 references
    2,300,364.2 Euro
    0 references
    46.45 percent
    0 references
    14 August 2020
    0 references
    13 November 2021
    0 references
    Jelgavas valstspilsētas pašvaldība
    0 references
    0 references

    56°38'58.45"N, 23°46'15.71"E
    0 references

    56°38'48.91"N, 23°46'2.53"E
    0 references

    56°38'48.91"N, 23°46'2.53"E
    0 references

    56°38'48.91"N, 23°46'2.53"E
    0 references

    56°38'48.91"N, 23°46'2.53"E
    0 references

    56°38'48.91"N, 23°46'2.53"E
    0 references

    56°38'48.91"N, 23°46'2.53"E
    0 references
    Projekta mērķisPalielināt privāto investīciju apjomu Jelgavas pilsētā, veicot ieguldījumus komercdarbības attīstībai atbilstoši pašvaldības attīstības programmā noteiktajai teritorijas ekonomiskajai specializācijai.Projekta darbības1. Būvdarbi, t.sk.:1.1. Jauna ielas posma izbūve;1.2. Gājēju un velosipēdistu ceļa izbūve;1.3. Ārējā apgaismojuma izbūve;1.4. Lietus ūdens kanalizācijas tīkla izbūve1.5. Ūdensvada un kanalizācijas tīklu izbūve;1.6. Elektroapgādes tīkla izbūve;1.7. Pašvaldības sakaru kanalizācijas izbūve;1.8. Gāzes apgādes tīklu izbūve;2. Būvdarbu būvuzraudzība un autoruzraudzība.3. Publicitātes pasākumi par projekta īstenošanu.Projekta īstenošanas laiksProjekta plānotais ilgums: 15 mēneši – no Vienošanās parakstīšanas līdz 2021.gada 31.oktobrim.Projekta izmaksasKopējās projekta izmaksas ir EUR 2 373 719.01, t.sk. ERAF līdzfinansējums ir EUR 1 068 596.78, valsts budžeta dotācija pašvaldībām ir EUR 307 941.85 un pašvaldības līdzfinansējums ir EUR 997 180.38, tai skaitā EUR 73 354.81, ir neattiecināmās izmaksas. Projekta rezultātiVeikta savienojošās ielas no Garozas ielas līdz Neretas ielai izbūve, izbūvēts gājēju un velosipēdistu celiņš, izbūvēti ūdensvada un kanalizācijas tīkli, lietus ūdens kanalizācijas tīkli, veikta elektroapgādes un ielu ārējā apgaismojuma izbūve. Tā rezultātā: • 7 komersanti gūs labumu no projekta ietvaros veiktajām investīcijām infrastruktūrā; • komersanti, kas gūs labumu no investīcijām infrastruktūrā, izveidos 19 jaunas darba vietas; • no projekta ietvaros veiktajām investīcijām infrastruktūrā labumu guvušie komersanti nefinanšu investīcijas pašu nemateriālajos ieguldījumos un pamatlīdzekļos plānotas EUR 1 070 312.00 apmērā. (Latvian)
    0 references
    Project objectiveTo increase the amount of private investments in Jelgava city by investing for commercial development in accordance with the economic specialisation of the territory defined in the municipal development programme.Project actions1. Construction work, including:1.1. Construction of a new street section;1.2. Pedestrians and cyclists road construction;1.3. Construction of external lighting;1.4. Construction of a rainwater sewerage network1.5. Construction of water mains and sewerage networks;1.6. Electricity supply network construction;1.7. Municipal communication drain construction;1.8. Construction of gas supply networks;2. Construction supervision and author supervision.3. Publicity measures on the implementation of the project.Time of project implementationThe planned duration of the project: 15 months – from the signing of the Arrangement until October 31, 2021.Project costs Total project costs are EUR 2 373 719.01, incl. ERDF co-financing is EUR 1 068 596.78, state budget grant to local governments is EUR 307 941.85 and municipality co-financing is EUR 997 180.38, including EUR 73 354.81, is ineligible costs. Project resultsConstruction of pedestrians and cyclists, construction of water supply and sewerage networks, rainwater drainage networks, construction of electric power supply and external street lighting, construction of pedestrians and cyclists, construction of water supply and sewerage streets from Garozas Street to Neretas Street. As a result: • 7 economic operators will benefit from investment in infrastructure within the framework of the project; • economic operators who will benefit from infrastructure investments will create 19 new jobs; • non-financial investments made within the framework of the project in infrastructure have benefited merchants in the amount of EUR 1 070 312.00 in their own intangible investments and fixed assets. (English)
    15 July 2021
    0 references
    Rubeņu ceļš, Jelgava
    0 references
    Rubeņu ceļš, Jelgava
    0 references
    Rubeņu ceļš, Jelgava
    0 references
    Rubeņu ceļš 2H, Jelgava, LV-3002
    0 references
    Rubeņu ceļš 2G, Jelgava, LV-3002
    0 references
    Rubeņu ceļš 2V, Jelgava, LV-3002
    0 references
    Rubeņu ceļš 2I, Jelgava, LV-3002
    0 references
    Rubeņu ceļš 2T, Jelgava, LV-3002
    0 references
    Rubeņu ceļš 2U, Jelgava, LV-3002
    0 references

    Identifiers

    3.3.1.0/19/I/005
    0 references