Technological park construction in Olaine (Q3056713)

From EU Knowledge Graph
Revision as of 19:35, 25 November 2021 by DG Regio (talk | contribs) (‎Created claim: summary (P836): construction d’un bâtiment de production dans le but de louer des locaux pour les opérateurs de l’industrie de transformation. Les nouveaux contrats de location de locaux industriels 5 ans après la mise en œuvre du projet ne seront conclus qu’avec les petits, petits et moyens négociants. Actuellement, des contrats de location pour 100 % des locaux ont déjà été conclus. Les informations sur les locataires sont décrites en détail à la section 4.3...)
Jump to navigation Jump to search
Project Q3056713 in Latvia
Language Label Description Also known as
English
Technological park construction in Olaine
Project Q3056713 in Latvia

    Statements

    0 references
    1,165,903.2 Euro
    0 references
    2,772,000.0 Euro
    0 references
    42.06 percent
    0 references
    20 January 2017
    0 references
    19 January 2021
    0 references
    SIA "GP TEHNOPARKI"
    0 references
    0 references

    56°48'8.68"N, 24°1'40.40"E
    0 references
    ražošanas ēkas būvniecība ar mērķi nodot telpas nomā apstrādes rūpniecības komersantiem. Jauni līgumi par ražošanas telpu nomu 5 gadus pēc projekta īstenošanas tiks slēgti tikai ar sīkiem, maziem un vidējiem komersantiem. Pašlaik jau noslēgti Nomas līgumi par 100% telpu nomu. Informācija par Nomniekiem detalizēti aprakstīta Biznesa plāna sadaļā nr. 4.3.Projekta ietvaros plānots būvēt jaunās ražošanas telpas ar kopējo platību 8 309 m2. Projekta īstenošanas vieta atrodas Olaines pilsētas teritorijā, kurā saskaņā ar pilsētas teritorijas plānojumu ir paredzēta rūpnieciskās ražošanas objektu apbūve.Projektā paredzēts īstenot aktivitātes: •Tehniskās dokumentācijas izstrāde (projekts pilnā sastāvā, projekts minimālā sastāvā jau izstrādāts un akceptēts).•Būvuzraudzība un autoruzraudzība projekta īstenošanas laikā.•Ražošanas ēkas būvniecības darbi.Projekta kopējās izmaksas sastāda 2 856 618 euro. Projekta attiecināmās izmaksas sastāda 2’772’000 euro, plānotājs ERAF finansējums sastāda 1’165’903,20 euro (42,06% no attiecināmām izmaksām). Projektam ir vidēji augsta gatavība uzsākšanai:•ir saņemta būvatļauja ar nosacījumiem projektēšanai un būvdarbiem;•Iepirkumu uzraudzības biroja mājas lapā ir publicēts projekta iesniedzēja paziņojums par iepirkuma procedūru saskaņā ar noteikumiem par iepirkuma procedūru un tās piemērošanas kārtību pasūtītāja finansētiem projektiem; •ir saņemts SEB bankas kredītkomitejas lēmums par aizdevuma piešķiršanu projekta īstenošanai ne mazāk ka 70% no projekta kopējām izmaksām.Projektu plānots uzsākt pēc līguma ar CFLA noslēgšanas un pabeigt līdz 19.01.2021. (Latvian)
    0 references
    construction of a production building with a view to renting premises to manufacturing enterprises. New lease contracts 5 years after the project will only be concluded with small, small and medium-sized merchants. Currently lease contracts for 100 % of premises have already been concluded. Information about tenants is described in detail in the Business Plan section No. 4.3. Within the project it is planned to build new production premises with a total area of 8309 m². The project implementation site is located in the territory of Olaine, where according to the city territory plan construction of industrial production objects is planned. •Development of technical documentation (complete project, project already developed and accepted in minimum composition).•Construction supervision and author supervision during project implementation.•Construction of the production building construction works.The total project costs are EUR 2856618. The eligible costs of the project are EUR 2'772'EUR 000, the planner’s ERDF funding is EUR 1,165'EUR 903,20 (42.06 % of the eligible costs). The project has a moderately high level of readiness:•a construction permit has been received with conditions for design and construction;•on the Procurement Monitoring Office website, a notice of the project proposer’s procurement procedure has been published in accordance with the rules on the procurement procedure and its application for projects financed by the contracting authority; •The decision of SEB Bank’s credit committee on granting a loan for the implementation of the project has been received not less than 70 % of the total project costs.The project is planned to start after the conclusion of the agreement with CFLA and to be completed by 19.01.2021. (English)
    15 July 2021
    0 references
    construction d’un bâtiment de production dans le but de louer des locaux pour les opérateurs de l’industrie de transformation. Les nouveaux contrats de location de locaux industriels 5 ans après la mise en œuvre du projet ne seront conclus qu’avec les petits, petits et moyens négociants. Actuellement, des contrats de location pour 100 % des locaux ont déjà été conclus. Les informations sur les locataires sont décrites en détail à la section 4.3 du plan d’entreprise. Dans le cadre du projet, il est prévu de construire de nouveaux locaux de production d’une superficie totale de 8 309 m². Le site de mise en œuvre du projet est situé sur le territoire de la ville d’Olaine, où, selon le plan spatial urbain, la construction d’installations de production industrielle est prévue. Le projet prévoit la mise en œuvre des activités: •Développement de la documentation technique (projet complet, projet dans une composition minimale déjà développée et acceptée).•Surveillance de la construction et supervision de l’auteur pendant la mise en œuvre du projet.•Travaux de construction de bâtiments de production.Le coût total du projet est de 28 566 118 EUR. Les coûts éligibles du projet s’élèvent à 2’772’000 EUR, le financement FEDER du planificateur s’élève à 1 165’903,20 EUR (42,06 % des coûts éligibles). Le projet est prêt à démarrer de manière moyenne:•un permis de construire a été obtenu avec des conditions de conception et de travaux de construction;•sur le site internet du Bureau de suivi des marchés publics, un avis sur la procédure de passation de marché a été publié conformément aux règles relatives à la procédure de passation de marché et à son application aux projets financés par le pouvoir adjudicateur; •le comité de crédit de la banque SEB a reçu la décision d’accorder un prêt pour la mise en œuvre du projet au moins 70 % du coût total du projet. Le projet devrait débuter après la conclusion du contrat avec la CFCA et être achevé d’ici au 19.01.2021. (French)
    25 November 2021
    0 references
    Olaines pag., Olaines nov.
    0 references

    Identifiers

    3.1.1.5/16/A/063
    0 references