Information technology infrastructure for the benefit of business and society: Investments and applications (Q2660019)

From EU Knowledge Graph
Revision as of 18:38, 25 November 2021 by DG Regio (talk | contribs) (‎Created claim: summary (P836): L’objectif du projet est d’étendre l’infrastructure des technologies de l’information dans et entre les municipalités et leurs localités de la région afin d’améliorer l’accessibilité et la sécurité, et de construire une infrastructure principalement pour les petites et moyennes entreprises, mais aussi pour les autorités et les organisations afin de stimuler une connexion accrue au haut débit. L’infrastructure fournit: —Municipalités concernées...)
Jump to navigation Jump to search
No description defined
Language Label Description Also known as
English
Information technology infrastructure for the benefit of business and society: Investments and applications
No description defined

    Statements

    0 references
    39,285,400.0 Swedish krona
    0 references
    3,889,254.6 Euro
    28 April 2021
    0 references
    24,878,262.0 Swedish krona
    0 references
    2,462,947.938 Euro
    28 April 2021
    0 references
    158.0 percent
    0 references
    1 March 2016
    0 references
    31 December 2019
    0 references
    Servanet AB
    0 references
    0 references
    85185
    0 references
    Projektets mål är dels att bygga ut den informationstekniska infrastrukturen i och mellan kommunerna och dess orter i regionen för ökad tillgänglighet och säkerhet, dels att bygga en infrastruktur främst till de små och medelstora företagen men även till myndigheter och organisationer för att därmed stimulera en ökad anslutning till bredband. Infrastrukturen ger: -Berörda kommuner ortsammanbindande nät. -Företag möjlig tillgång till 100 Mbit/s i linje med 2020-målet. Och därmed möjliggöra att det år 2020 ska finnas möjlighet för alla fasta offentliga arbetsställen inom de ortsammanbindande sträckorna att ha tillgång till bredband om minst 100 Mbit/s. Projektet genererar främst följande resultat: - Möjliggör att det år 2020 ska finnas ett öppet, robust och operatörsneutralt nät mellan och inom berörda kommuner i länet. - Det ortsammanbindande nätet kopplas ihop med de befintliga näten i Jämtland, Västernorrland och landet i övrigt. - Utbyggnaden av bredband har skett på prioriterade platser. - Operatörer och tjänsteleverantörer möjlighet att leverera trådbundna och trådlösa tjänster till nya områden. - Åtkomst till en större arbetsmarknad från orter där de boende i dag är utestängda från denna på grund av undermålig IT-kommunikation. - Kommunikationsmöjligheter mellan fler orter i kommunerna samt stärka och säkra befintliga samarbetsmöjligheter. - En möjlig plattform för kulturella tjänster på landsbygden, exempelvis livesända teateruppsättningar eller operakonserter. Respektive kommun äger efter projekttiden de nät som byggs inom kommunen. Efter en revidering av de sökta sträckorna (se ansökan) utifrån offentliga samrådet sommaren 2015, är nedan beskrivna sträckor aktuella i denna ansökan. Revidering av budgeten har också gjort med hänsyn till detta (se vidare i budgeten). Berg Namn Sträcka Totalkostnad Länsgränsen - Rätans kraftverk 14000 3 220 000 kr Svenstavik - Sandsnäset o Gillhov 34000 7 888 000 kr Dalåsen Vigge 6200 1 426 000 kr Rätan Nästeln Kvarnsjö 17000 3 910 000 kr 16 444 000 kr Ragunda Namn Sträcka Totalkostnad Stugun - mot hammerdal 35000 8 120 000 kr Skyttmon - björkhöjden 32000 7 648 000 kr 15 768 000 kr Strömsund Namn Sträcka Totalkostnad Hammerdal-kommungräns 344an 23000 5 520 000 kr Ulriksfors - Backe 75000 18 000 000 kr Gåxsjö-Strömsund 36000 8 640 000 kr Hoting - Backe 50500 11 716 000 kr 43 876 000 kr Resterande kostnader ligger i ServaNet inom kostnadsslagen: projektstyrning, -ledning, information , material och utrustning. (Swedish)
    0 references
    The goal of the project is partly to expand the information technology infrastructure in and between the municipalities and its locations in the region for increased accessibility and security, partly to build an infrastructure primarily to the small and medium-sized enterprises, but also to authorities and organisations to stimulate an increased connection to broadband. The infrastructure provides: —Influencing municipalities’ local network. —Companies possible access to 100 Mbit/s in line with the 2020 target. In this way, it will be possible for all fixed public establishments within the localised distances to have access to broadband of at least 100 Mbps by 2020. The project mainly generates the following results: — Enables that by 2020 there will be an open, robust and operator-neutral network between and within the municipalities concerned in the county. — The local network is connected to the existing networks in Jämtland, Västernorrland and the rest of the country. — The expansion of broadband has taken place in prioritised locations. — Operators and service providers the ability to deliver wired and wireless services to new areas. — Access to a larger labour market from locations where residents today are excluded from this due to poor IT communication. — communication opportunities between more municipalities and strengthen and secure existing opportunities for cooperation. — A possible platform for cultural services in rural areas, such as live theatre productions or opera concerts. After the project period, each municipality owns the networks that are being built within the municipality. After a revision of the routes applied for (see application) based on the public consultation in summer 2015, the routes described below are relevant in this application. The revision of the budget has also taken into account this (see further in the budget). Mountain Name Total cost of the county limit – Rätans power plant 14000 3 220 000 kr Svenstavik – Sandsnäset o Gillhov 34000 7 888 000 kr Dalåsen Vigge 6200 1 426 000 kr Rätan Nästeln Kvarnsjö 170003910 SEK 16444000 SEK Ragunda Name Stretch Total cost Stugun – towards Hammerdal 350008120 SEK Skytmon – Björkhöjden 32000 7 648 000 kr 155 SEK 15768000 SEK Strömsund Name Frequent cost 344344344344520520520520000520 SEK 000520 SEK 000 520 000 520 520 16.444 344 344 344 344 520 520 520 520 520 520 520 000 520 520 520 520 520 520 520 520 520 520 520 000 520 520 520 520 000 520 520 000 520 520 520 520 000 520 000 520 000 520 520 520 520 520 520 000 000 520 520 520 520 520 000 520 000 520 000 000 520 000 520 520 520 520 520 520 520 520 520 520 520 520 520 520 520 520 520 520 520 520 520 520 520 520 520 520 520 520 520 520 520 000 520 520 000 520 520 000 520 000 520 520 520 000 520 520 520 520 520 520 520 520 000 520 520 000 000 344 344 000 344 000 520 000 520 000 520 000 520 000 520 000 520 000 520 000 520 000 520 000 520 000 000 520 000 520 520 000 000 520 000 000 000 520 000 000 520 520 520 000 000 520 520 520 000 000 000 000 000 520 000 000 000 000 000 000 000 000 000 000 000 000 000 000 000 000 000 000 000 000 000 000 520 000 000 000 000 000 520 000 520 000 520 000 520 520 520 000 520 000 000 520 000 520 520 520 project management, management, information, materials and equipment. (English)
    29 April 2021
    0 references
    L’objectif du projet est d’étendre l’infrastructure des technologies de l’information dans et entre les municipalités et leurs localités de la région afin d’améliorer l’accessibilité et la sécurité, et de construire une infrastructure principalement pour les petites et moyennes entreprises, mais aussi pour les autorités et les organisations afin de stimuler une connexion accrue au haut débit. L’infrastructure fournit: —Municipalités concernées par les réseaux locaux. — Les entreprises peuvent accéder à 100 Mbps conformément à l’objectif fixé pour 2020. D’ici 2020, tous les établissements publics permanents des tronçons d’interconnexion urbaine pourront accéder au haut débit d’au moins 100 Mbps. Le projet produit principalement les résultats suivants: — Permet un réseau ouvert, robuste et neutre pour les opérateurs entre les municipalités concernées du comté et à l’intérieur de celles-ci d’ici 2020. — Le réseau local est relié aux réseaux existants dans le Jämtland, le Västernorrland et le reste du pays. — Le déploiement du haut débit a eu lieu dans des endroits prioritaires. — Les opérateurs et les fournisseurs de services sont en mesure de fournir des services filaires et sans fil à de nouvelles régions. — Accès à un marché du travail plus large à partir d’endroits où les résidents en sont actuellement exclus en raison d’une mauvaise communication informatique. — Les possibilités de communication entre davantage de localités dans les municipalités et le renforcement et la sécurisation des possibilités de coopération existantes. — Une plate-forme possible pour les services culturels dans les zones rurales, tels que des salles de théâtre en direct ou des concerts d’opéra. Après la période du projet, chaque municipalité est propriétaire des réseaux construits au sein de la municipalité. À la suite d’une révision des sections demandées (voir demande) sur la base de la consultation publique de l’été 2015, les sections décrites ci-dessous sont pertinentes dans la présente demande. Le budget a également été révisé en conséquence (voir également dans le budget). Berg Nom Stretch Coût total Frontière du comté — Rätans centrale électrique 140 003 220 000 SEK Svenstavik — Sandsnäset o Gillhov 34 000 SEK 7 888 000 Dalåsen Vigge 6 200 SEK 1 426 000 Rätan Nästeln Kvarnsjö 17000 3 910 000 kr 16 444 000 kr Ragunda Nom Extended Total Coût Stugun — vers Hammerdal 35 000 SEK 8 120 000 Shooting mon — Björkhöj 32000 7 648 000 kr 15 768 000 kr Strömsund Nom Coût total de la municipalité de Hammerdal frontière 344an 23 000 SEK 5 520 000 Ulriksfors — Backe 75 000 SEK 18 000 000 Gåxsjö-Strömsund 36 000 SEK 8 640 000 SEK Hoting — Backe 5 050 011 716 000 SEK 43 876 000 Les autres coûts sont situés à Servanet dans les catégories de coûts: gestion de projet, gestion, information, matériel et équipement. (French)
    25 November 2021
    0 references

    Identifiers

    20200631
    0 references