“Construction of micro-installations for utility facilities in the municipalities of the municipalities, Michalów and Złoty” (Q127516)

From EU Knowledge Graph
Revision as of 14:25, 10 March 2020 by Wildmax (talk | contribs) (‎Changed claim: summary (P836): The project concerns the construction of 55 micro-installations PV assembled on public facilities belonging to the municipality of Michałów (8 pcs), Działoszyce (21), Złota (26), total power of the 0.54 MW installation. The project will be implemented as part of the partnership, Leader of the Złota Commune, based on the design and build formula. The project goal is to increase the amount of energy obtained from renewable energy sources, improve...)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
“Construction of micro-installations for utility facilities in the municipalities of the municipalities, Michalów and Złoty”
Project in Poland financed by DG Regio

    Statements

    0 references
    1,159,769.8 zloty
    0 references
    278,344.752 Euro
    13 January 2020
    0 references
    2,880,977.07 zloty
    0 references
    691,434.4968 Euro
    13 January 2020
    0 references
    60.0 percent
    0 references
    1 October 2018
    0 references
    30 September 2019
    0 references
    GMINA ZŁOTA
    0 references
    Projekt dotyczy budowy 55 mikroinstlacji PV montowanych na obiektach użyteczności publicznej należących do gminy Michałów(8 szt),Działoszyce(21),Złota(26),łączna moc instalacji 0,54 MW.Projekt będzie realizowany w ramach zawartego partnerstwa,Lider Gmina Złota, w oparciu o formułę zaprojektuj i wybuduj.CELEMprojektu jest zwiększenie ilości en.pozyskiwanej ze źródeł oze, poprawa jakości i ochrony środowiska oraz redukcja emisji Co2. Realizacja projektu wraz z planowanymi do zastosowania rozwiązaniami wpisuje się w cele i założenia III osi priorytetowejRPO. Odnosi się bezpośrednio do celu szczegółowego działania 3.1 Zwiększony udział energii produkowanej z OZE w ogólnej produkcji energii w woj.świętokrzyskim. Działania te przyczynią się do redukcji zapotrzebowania na paliwa nieodnawialne oraz redukcję emisji unikniętej Co2,a przez to poprawę jakości powietrza. Założone cele dla projektu są spójne z celem szczegółowym dla działania 3.1, gdzie wsparcie przewidziano m.in. na projekty polegające na :budowie infrastruktury, służącej do wytwarzania energii elektrycznej. Łączna moc nowo utworzonych instalacji 0,54 MW, umożliwi wytworzenie 493,92MWh/rok energii elektrycznej i wpłynie na redukcję emisji CO2 o 394.14Mg,pośrednio na redukcję PM10 o 0,03Mg.Energia będzie wykorzystana na własne potrzeby. Główne elementy to panele poli o mocy jednostkowej 280W, falowniki, kable, konektory, konstrukcja montazowa.Zastosowany będzie licznik. PROJEKT wpłynie na REDUKCJĘ ZAPOTRZEBOWANIA NA ENERGIĘ KONWENCJONALNĄ. Ze względu na moc instalacji poniżej 40 kW brak konieczności pozyskania pozwoleń,decyzji środowiskowej,czy koncesji.Pełna gotowość formalno-prawna. Partnerzy zabezpieczyli środki na realizację projektu w WPI.Rzeczowa realizacja inwestycji od 4kw2018 do 30.09.2019 r. Projekt jest spójny zPGN. Działania DODATK: EDUKACYJNE,panele PVcycle,STWORZENIE lepszych warunków dla zachowania BIORÓŻNORODNOŚCI poprzez poprawę jakości powietrza.1 nowy etat. (Polish)
    0 references
    The project concerns the construction of 55 micro-installations PV assembled on public facilities belonging to the municipality of Michałów (8 pcs), Działoszyce (21), Złota (26), total power of the 0.54 MW installation. The project will be implemented as part of the partnership, Leader of the Złota Commune, based on the design and build formula. The project goal is to increase the amount of energy obtained from renewable energy sources, improve quality and protect the environment and reduce CO2 emissions. The implementation of the project, together with the solutions planned to be used, is in line with the objectives and assumptions of the 3rd priority axis of the RPO. It relates directly to the specific objective of Measure 3.1. Increased share of energy produced from RES in the total energy production in the Świętokrzyskie voivodship. These activities will contribute to the reduction of demand for non-renewable fuels and reduction of avoided CO2, and thus the improvement of air quality. The assumed goals for the project are consistent with the specific objective for measure 3.1, where support was provided, among others for projects involving the construction of infrastructure for generating electricity. The total capacity of the newly created 0.54 MW installations will enable the generation of 493.92MWh / year of electricity and will reduce CO2 emissions by 394.14Mg, indirectly reducing PM10 by 0.03Mg. Energy will be used for its own needs. The main elements are poly panels with 280W unit power, inverters, cables, connectors, assembly structure. A meter will be used. THE PROJECT will affect REDUCTION OF CONVENTIONAL ENERGY. Due to the installation's power below 40 kW, there is no need to obtain permits, environmental decisions or concessions. Full formal and legal readiness. The partners secured funds for the implementation of the project at WPI. The implementation of the investment from 4Q2018 to 30/09/2019. The project is consistent with PGN. ADDITIONAL ACTIVITIES: EDUCATIONAL, PVcycle panels, CREATING better conditions for maintaining BIODIVERSITY by improving air quality. 1 new job. (English)
    0 references

    Identifiers

    RPSW.03.01.00-26-0076/17
    0 references