Coastline Management — Draging the South Beach and Creating a Sediment Trap (Q3713428)

From EU Knowledge Graph
Revision as of 19:46, 24 November 2021 by DG Regio (talk | contribs) (‎Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string)
Jump to navigation Jump to search
Project Q3713428 in France
Language Label Description Also known as
English
Coastline Management — Draging the South Beach and Creating a Sediment Trap
Project Q3713428 in France

    Statements

    0 references
    1,320,000.0 Euro
    0 references
    2,200,000.0 Euro
    0 references
    60.0 percent
    0 references
    1 January 2017
    0 references
    31 December 2019
    0 references
    GRAND PORT MARITIME DE LA REUNION
    0 references
    0 references
    La réalisation du dragage de la plage vise à permettre une meilleure maîtrise du gabarit du chenal. Les travaux consistent à créer une fosse à sédiments marins entre l’épi Sud et la jetée Sud du Port-Ouest, par excavation sur l’estran. (French)
    0 references
    The aim of dredging the beach is to enable a better control of the channel gauge. The work consists of creating a marine sediment pit between the South Spike and the South Port West Pier by excavation on the foreshore. (English)
    22 November 2021
    0 references

    Identifiers

    RE0018922
    0 references