Creation of a swimming pool at the campsite in Trélachaume (Q3698686)

From EU Knowledge Graph
Revision as of 18:14, 24 November 2021 by DG Regio (talk | contribs) (‎Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string)
Jump to navigation Jump to search
Project Q3698686 in France
Language Label Description Also known as
English
Creation of a swimming pool at the campsite in Trélachaume
Project Q3698686 in France

    Statements

    0 references
    117,561.0 Euro
    0 references
    399,868.93 Euro
    0 references
    29.4 percent
    0 references
    15 February 2017
    0 references
    1 June 2017
    0 references
    SCI FPB
    0 references
    0 references
    Le projet mis en place au camping Trélachaume est double : d’une part, il s’agit de la création d’une piscine de 200 M2, et d’autre part de la rénovation de la pataugeoire attenante qui existe déjà depuis une trentaine d’années. Les deux bassins seront entourés de plages et clôturés conformément à la réglementation en vigueur. Ils seront accessibles aux personnes en situation de handicap et parfaitement intégrés sur le plan paysager (French)
    0 references
    The project set up at Campsite Trélachaume is twofold: on the one hand, it is the creation of a 200 m² swimming pool, and on the other hand the renovation of the adjoining paddling pool, which has already existed for thirty years. The two basins will be surrounded by beaches and fenced in accordance with the regulations in force. They will be accessible to people with disabilities and perfectly integrated in the landscape (English)
    22 November 2021
    0 references

    Identifiers

    FC0012640
    0 references