No label defined (Q3750604)

From EU Knowledge Graph
Revision as of 22:52, 22 November 2021 by DG Regio (talk | contribs) (‎Created claim: summary (P836): The project will design a pre-ideal method for extending the service life of steel pipe bridges by means of renovation. The method can be renovated at a reasonable cost from a pipe bridge or drum without having to replace/repair it in its entirety. The method and its details are designed in such a way that they are used efficiently and inexpensive in industrial production. The correction method will be tested under laboratory conditions and then...)
Jump to navigation Jump to search
Project Q3750604 in France
Language Label Description Also known as
English
No label defined
Project Q3750604 in France

    Statements

    0 references
    14,200 Euro
    0 references
    14,200.0 Euro
    0 references
    100.0 percent
    0 references
    1 February 2017
    0 references
    31 August 2018
    0 references
    OY LATIUM LTD
    0 references

    61°29'45.71"N, 23°46'20.64"E
    0 references
    33100
    0 references
    Hankkeessa suunnitellaan valmiiksi ideatason menetelmä teräksisten putkisiltojen käyttöiän pidentämiseksi peruskorjauksen avullla. Menetelmän avulla voidaan kohtuullisin kustannuksin peruskorjata putkisilta tai rumpu tarvitsematta vaihtaa/korjata sitä kokonaisuudessaan.Menetelmä ja sen yksityiskohdat suunnitellaan valmiiksi siten, että niiden käyttö on tehokasta ja teollinen valmistaminen edullista. Korjausmenetelmä koekuormitetaan laboratorio-olosuhteissa ja sen jälkeen toteutetaan pilottikohde yhdessä ELY-tieyksikön kanssa. (Finnish)
    0 references
    The project will design a pre-ideal method for extending the service life of steel pipe bridges by means of renovation. The method can be renovated at a reasonable cost from a pipe bridge or drum without having to replace/repair it in its entirety. The method and its details are designed in such a way that they are used efficiently and inexpensive in industrial production. The correction method will be tested under laboratory conditions and then a pilot site will be implemented together with the ELY Road Unit. (English)
    22 November 2021
    0 references

    Identifiers

    0 references