The supply and installation of heat pumps with the fitting of existing installations in the sports facilities of MOSiR Knurów to ul. Mining 2 and ul. Hospital 23 in Knurów (Q123721)

From EU Knowledge Graph
Revision as of 10:02, 10 March 2020 by DG Regio (talk | contribs) (‎Created claim: summary (P836): The project’s material scope covers the delivery and installation of heat pumps with the fitting of an existing installation in the sports facilities of the MOSiR in Knurów: A swimming pool at ul. Hospital 23, — sports hall and swimming pool at ul. Mining 2. The task will be carried out in the design and structure of the project. PFU covers the scope of two steps, this proposal only covers the scope of Phase I., Adding English summary)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
The supply and installation of heat pumps with the fitting of existing installations in the sports facilities of MOSiR Knurów to ul. Mining 2 and ul. Hospital 23 in Knurów
Project in Poland financed by DG Regio

    Statements

    0 references
    1,472,625.0 zloty
    0 references
    353,430.0 Euro
    13 January 2020
    0 references
    1,732,500.0 zloty
    0 references
    415,800.0 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    8 May 2017
    0 references
    15 November 2019
    0 references
    GMINA KNURÓW
    0 references

    50°12'25.9"N, 18°39'49.3"E
    0 references
    Rzeczowy zakres projektu obejmuje dostawę i montaż pomp ciepła wraz z dostosowaniem istniejącej instalacji w obiektach sportowych MOSiR w Knurowie: - pływalnia kryta przy ul. Szpitalnej 23, - hala sportowa i pływalnia kryta przy ul. Górniczej 2. Zadanie realizowane będzie w formule zaprojektuj i buduj. PFU obejmuje zakres dwóch etapów, niniejszy wniosek obejmuje wyłącznie zakres etapu I. (Polish)
    0 references
    The project’s material scope covers the delivery and installation of heat pumps with the fitting of an existing installation in the sports facilities of the MOSiR in Knurów: A swimming pool at ul. Hospital 23, — sports hall and swimming pool at ul. Mining 2. The task will be carried out in the design and structure of the project. PFU covers the scope of two steps, this proposal only covers the scope of Phase I. (English)
    0 references

    Identifiers

    RPSL.04.01.01-24-039B/17
    0 references