PSZOK in Pelplno — increase in the awareness of residents and the efficiency of waste separation (Q122542)

From EU Knowledge Graph
Revision as of 09:52, 10 March 2020 by DG Regio (talk | contribs) (‎Created claim: summary (P836): Requesting the construction of 1 PSZOK site in dz.3/12 in Pelplno and innovative outreach and educational activities to increase the ecological awareness of the 16717 inhabitants and increase the efficiency of waste separation in the municipality of Pelplin. Scope of the project: building and wind with infrastructure (including RES), equipment and equipment and means of transport for the segregation of waste. There will also be an educational ro...)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
PSZOK in Pelplno — increase in the awareness of residents and the efficiency of waste separation
Project in Poland financed by DG Regio

    Statements

    0 references
    1,693,417.43 zloty
    0 references
    406,420.18319999997 Euro
    13 January 2020
    0 references
    1,992,255.8 zloty
    0 references
    478,141.392 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    1 September 2018
    0 references
    30 August 2019
    0 references
    GMINA PELPLIN
    0 references
    Proj. dot. budowy 1 obiektu PSZOK na dz.3/12 w Pelplinie i innowacyjnych działań informacyjno-edukacyjnych w celu zwiększenia proekologicznej świadomości 16717 mieszkańców oraz wzrostu efektywności segregacji odpadów w gminie Pelplin. Zakres projektu: budynek i wiata z infrastrukturą (w tym OZE), i wyposażeniem oraz specjalist.urządzenia i środki transportu do segregacji odpadów. Zaplanowano też salę edukacyjną i eko-ogródek, punkt napraw i wymiany zepsutego sprzętu. Poprzez innowacyjne rozwiązania techn., organiz. i niekonwencjonalny sposób zaangażowania seniorów i młodzieży, projekt przyczyni się do włączenia mieszkańców w zarządzanie PSZOKiem i poprawnej segregacji na zasadzie: ODPOWIEDZIALNOŚĆ BIERZE SIĘ Z ZAANGAŻOWANIA. Realizacja działań pozwoli na rozwiązanie problemów gospodarki odpadami kompleksowo, w prawnie określonych terminach. Pomysł doprowadzi też do zwiększenia efektywności energetycznej, obniżenia emisji gazów cieplarnianych i wzrostu wykorzystania energii odnawialnej. (Polish)
    0 references
    Requesting the construction of 1 PSZOK site in dz.3/12 in Pelplno and innovative outreach and educational activities to increase the ecological awareness of the 16717 inhabitants and increase the efficiency of waste separation in the municipality of Pelplin. Scope of the project: building and wind with infrastructure (including RES), equipment and equipment and means of transport for the segregation of waste. There will also be an educational room and an eco-label, a point for the repair and replacement of spoilt equipment. Through innovative solutions to techn., and to promote the involvement of seniors and young people in a conventional way, the project will contribute to the inclusion of people in the management of the plan and correct segregation, on the basis of: THE RESPONSIBILITY IS TAKEN FROM THE COMMITMENT. The implementation of the actions will help to address the issues of waste management comprehensively within the legal deadlines. The idea will also lead to increased energy efficiency, lower greenhouse gas emissions and increased use of renewable energy. (English)
    0 references

    Identifiers

    RPPM.11.02.00-22-0010/17
    0 references