Reconstruction of a training building for vocational training courses in the School Complex. Józef Kustronia, Lubaczów. (Q119252)

From EU Knowledge Graph
Revision as of 09:46, 10 March 2020 by DG Regio (talk | contribs) (‎Created claim: summary (P836): The general objective of the project is to improve the conditions for vocational and continuing training in the county of Lubaczowski. The main objective shall be pursued through the following specific objectives: — improving the accessibility of the social building of the Team of Schools in Lubaczow, the upgrading of the social and continuing education building, adapting it to the needs of lifelong learning, — reducing energy losses by means of...)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
Reconstruction of a training building for vocational training courses in the School Complex. Józef Kustronia, Lubaczów.
Project in Poland financed by DG Regio

    Statements

    0 references
    2,988,384.01 zloty
    0 references
    717,212.1623999999 Euro
    13 January 2020
    0 references
    4,754,075.49 zloty
    0 references
    1,140,978.1176 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    10 October 2016
    0 references
    28 February 2018
    0 references
    POWIAT LUBACZOWSKI
    0 references
    Celem ogólnym projektu jest poprawa warunków kształcenia zawodowego i ustawicznego w powiecie lubaczowskim. Cel główny będzie realizowany poprzez następujące cele szczegółowe: -poprawę dostępności budynku edukacyjno socjalnego Zespołu Szkół w Lubaczowie dla osób niepełnosprawnych, - przebudowę budynku edukacyjno socjalnego z dostosowaniem go do potrzeb kształcenia ustawicznego, - zmniejszenie strat energii poprzez termomodernizację, wymianę instalacji elektrycznej, CO i wodnej. Zadanie obejmuje całkowitą przebudowę budynku dydaktycznego, w którym oprócz pracowni dydaktycznych znajdują się pokoje socjalne dla uczniów oraz stołówka i kuchnia. Łącznie pow. użytkowa w budynku po przebudowie = 2.284,16 m2, w tym pow. internatu – 543,20 m2, pow. stołówki 294,55 m2 i pow. dydaktyczne – 1446,41 m2. Kubatura budynku po przebudowie = 13.986,96 m3. Jak wynika z powyższego zestawienia powierzchni dominujący zakres robót dotyczy pomieszczeń dydaktycznych. W budynku zaprojektowano pracownie do nauki przedmiotów zawodowych i języków obcych zawodowych, kuchnię wraz z zapleczem i stołówkę, pokoje sypialne dla uczniów z pomieszczeniami sanitarnymi oraz pomieszczenia sanitarne ogólnodostępne i pomocnicze. Parter budynku dostępny będzie dla osób niepełnosprawnych z poziomu chodnika, natomiast piętro budynku poprzez dźwig osobowy. W obrysie klatki schodowej zostanie wykonany szyb panoramiczny dla dźwigu osobowego. Dźwig projektuje się jako 3-przystankowy: parter, I piętro i poddasze nieużytkowe. W ramach gruntownej przebudowy zostaną wykonane nowe stropy, posadzki, zostanie zmieniony układ pomieszczeń, Ponadto wymienione zostaną wszystkie instalacje C.O. elektryczna, wod. kan, zostanie zamontowana nowa stolarka drzwiowa i okienna zewnętrzna i wewnętrzna. Ściany zewnętrzne zostaną docieplone styropianem gr.15cm, fundamenty styropianem gr. 5 cm, posadzki na gruncie styropianem gr. 10 cm, górny strop styr. 30 cm.W ramach prac zostanie również wykonany nowy dach łącznie z więźbą dachową. (Polish)
    0 references
    The general objective of the project is to improve the conditions for vocational and continuing training in the county of Lubaczowski. The main objective shall be pursued through the following specific objectives: — improving the accessibility of the social building of the Team of Schools in Lubaczow, the upgrading of the social and continuing education building, adapting it to the needs of lifelong learning, — reducing energy losses by means of thermo-modernisation, replacement of electrical installations, CO and water. The task consists of the complete redevelopment of a teaching building in which, in addition to the teaching staff, there are social rooms for pupils and a canteen and a kitchen. Total formulation in use in building following reconstruction = 2 284.16 m², including an internet user of 543.20 m², a canteen of 294.55 m², and an educational establishment of 1 446.41 m². Volume of building after conversion = 13 986.96 m³. It follows from the summary of the main area of the works that the scope of the works relates to the school premises. In the building, the building is designed for the learning of professional subjects and languages, a kitchen with the hinterland and a canteen, sleeping rooms for school pupils with sanitary and public health facilities, as well as public and auxiliary sanitary facilities. The floor area of the building will be accessible for persons with disabilities from the pavement and floor by a car. The contour of the stairway shall be made of the panoramic glass pane for the lift. A lift is designed to be 3 stop: ground floor, first floor and non-useful alternatives. New ceilings, floors will be changed as part of a major overhaul, and the layout of the rooms will be changed, and all the electrical installations will be replaced, the doors of the doors and windows of the door and inside windows will be mounted. The walls will be contacted by a styropian gr.15cm, with the foundation of a 5 cm pin, a floor for a styropiate floor with a height of 10 cm high, and the top of the pin. 30 cm.In the course of the work, a new roof will also be constructed with the roof of the roof. (English)
    0 references

    Identifiers

    RPPK.06.04.02-18-0004/16
    0 references