Restoration of 1 landfill non-hazardous non-inert waste disposal sites in Silenow, gmina Kraszów (Q118875)
Jump to navigation
Jump to search
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Restoration of 1 landfill non-hazardous non-inert waste disposal sites in Silenow, gmina Kraszów |
Project in Poland financed by DG Regio |
Statements
701,562.51 zloty
0 references
2,129,577.89 zloty
0 references
47.58 percent
0 references
10 April 2017
0 references
31 December 2020
0 references
ZAKŁAD GOSPODARKI KOMUNALNEJ SP. Z O.O.
0 references
Celem nadrzędnym projektu jest minimalizacja negatywnego oddziaływania na środowisko i przywrócenie wartości przyrodniczych terenu kwatery Nr 1 o pow. 1,2 ha, jako części składowiska odpadów innych niż niebezpieczne i obojętne w Sigiełkach, gm. Krzeszów. Zadaniem rekultywacji kwatery Nr 1 jest zabezpieczenie i uszczelnienie jego powierzchni w celu niedopuszczenia do infiltracji wód opadowych w głąb korpusu wysypiska, odprowadzenia w maksymalnym stopniu wód opadowych poza obręb składowiska, zapobieżenia przed wydostawaniem się gazów pochodzących z procesów fermentacji poza obręb składowiska, zabezpieczenia przed pyleniem i roznoszeniem przez wiatr lekkich części składowanych odpadów oraz zapobieżenia erozji powierzchni wysypiska. Cele bezpośrednie obejmują:- zabezpieczenie kwatery Nr 1 na składowisku przed jego szkodliwym oddziaływaniem na wody powierzchniowe i podziemne, a także ograniczenie zanieczyszczenia powietrza;- przywrócenie wartości przyrodniczych obszaru rekultywowanego składowiska oraz nadanie mu nowych wartości użytkowych, - zabezpieczenie składowiska przed niekontrolowanymi pożarami. Zakres obejmuje wykonanie:- roboty rozbiórkowe w części dotyczącej rekultywacji;- wykonania prac umożliwiających późniejszy monitoring składowiska, (budowa jedynej drogi dojazdowej)- ukształtowania bryły składowiska pod warstwy rekultywacyjne kwatery, wraz z jej zagęszczeniem;- ułożenie warstwy wyrównującej z gruntu mineralnego lub pokruszonych odpadów; - ułożenie geosyntetyków;- ułożenie drenaży obwodowych u podnóża skarp z budowa zbiornika odparowująco - szczelnego;- wykonanie warstwy zakrywającej z gruntu rodzimego, piasku lub drobnego żwiru;- ułożenie warstwy wierzchniej tj. mieszaniny ziemi z kompostem;- ułożenie mat przeciwerozyjnych na skarpach;- wykonanie rekultywacji biologicznej;- wykonanie inwentaryzacji geodezyjnej po technicznym zamknięciu składowiska. (Polish)
0 references
The overall aim of the project is to minimise the negative impact on the environment and restore the natural value of the site of cell No 1. 1.2 ha, as part of a non-hazardous non-inert waste disposal site in Silenow, Krzeszów. The purpose of the rehabilitation of cell No 1 is to secure and seal its surface in order to prevent rainwater infiltration into the body of the landfill, to divert water from the landfill site to the maximum extent outside the landfill site, to prevent gases from fermentation outside the landfill, to prevent dust from escaping, and to prevent dumping by the wind of a lightweight part of the waste deposited and prevent the erosion of the surface of the landfill. The direct objectives are to ensure that cell No 1 is secured at the site from its adverse effects on surface water and underground water, as well as to reduce air pollution; — restore the natural value of the reclaimed landfill site and add value to it, — cover the storage site against uncontrolled fire. The scope covers: — demolition works in the part relating to recultivation; — implementation of works enabling subsequent monitoring of the landfill (construction of the only access road) — Seating the landfill of the landfill for the restoration layer of the accommodation, including its density; — the provision of a layer that offsets the mineral ground or waste; — placement of geosynthetics; — Lodging of a ring fence at the base of turbot with the construction of an evaporating dish — sincerity; — performance of a layer covering land, sand or fine gravel; — surface layer, i.e. a mixture of soil with compost; — approach the use of anti-erosion mats; — implementation of the land survey after the technical closure of the site. (English)
0 references
The overall aim of the project is to minimise the negative impact on the environment and restore the natural value of the site of cell No 1. 1.2 ha, as part of a non-hazardous non-inert waste disposal site in Silenow, Krzeszów. The purpose of the rehabilitation of cell No 1 is to secure and seal its surface in order to prevent rainwater infiltration into the body of the landfill, to divert water from the landfill site to the maximum extent outside the landfill site, to prevent gases from fermentation outside the landfill, to prevent dust from escaping, and to prevent dumping by the wind of a lightweight part of the waste deposited and prevent the erosion of the surface of the landfill. The direct objectives are to ensure that cell No 1 is secured at the site from its adverse effects on surface water and underground water, as well as to reduce air pollution; — restore the natural value of the reclaimed landfill site and add value to it, — cover the storage site against uncontrolled fire. The scope covers: — demolition works in the part relating to recultivation; — implementation of works enabling subsequent monitoring of the landfill (construction of the only access road) — Seating the landfill of the landfill for the restoration layer of the accommodation, including its density; — the provision of a layer that offsets the mineral ground or waste; — placement of geosynthetics; — Lodging of a ring fence at the base of turbot with the construction of an evaporating dish — sincerity; — performance of a layer covering land, sand or fine gravel; — surface layer, i.e. a mixture of soil with compost; — approach the use of anti-erosion mats; — implementation of the land survey after the technical closure of the site. (English)
0 references
Identifiers
RPPK.04.02.00-18-0024/19
0 references