Revision as of 08:55, 10 March 2020 by DG Regio (talk | contribs) (‎Created claim: summary (P836): The aim of the project is to increase the energy efficiency of the Housing Cooperative’s buildings in England. The investment in question consists of the thermal renovation of two residential buildings (61 and 62) and the thermal modernisation of the local district heating network. In both facilities, the following works are planned: the insulation of the external walls, the insulation of the outer wall, the insulation of the outer walls, the wa...)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
Increasing the energy efficiency of Housing Cooperatives
Project in Poland financed by DG Regio

    Statements

    0 references
    744,163.78 zloty
    0 references
    178,599.3072 Euro
    13 January 2020
    0 references
    875,486.82 zloty
    0 references
    210,116.8368 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    1 June 2017
    0 references
    31 December 2017
    0 references
    SPÓŁDZIELNIA MIESZKANIOWA W DĘBNIE
    0 references
    Celem projektu jest podniesienie efektywności energetycznej budynków Spółdzielni Mieszkaniowej w Dębnie. Przedmiotowa inwestycja polega na termomodernizacji dwóch budynków mieszkalnych (nr 61 i 62) oraz termomodernizację lokalnej sieci ciepłowniczej. W obu obiektach planowane są następujące prace:- Ocieplenie ścian zewnętrznych podłużnych,- Ocieplenie stropodachów,- Ocieplenie ścian zewnętrznych szczytowych,- Ocieplenie ścian zewnętrznych piwnic,- Wymiana drzwi zewnętrznych,- Ocieplenie ścian zewnętrznych przy gruncie,Ponadto planowana jest modernizacja kotłowni węglowej na kotłownie opalaną biomasą, która zlokalizowana jest przy budynku nr 61 - kotłownia służy zapewnieniu ciepła dla obu budynków mieszkalnych. W odniesieniu do lokalnej sieci ciepłowniczej planowana jest wymiana istniejącej kanałowej sieci ciepłowniczej na nową preizolowaną o zmniejszonych średnicach dostosowanych do aktualnego zapotrzebowania na ciepło. Planowana jest również zmiana nośnika energii z węgla kamiennego na biomasę – pellety wraz z remontem kotłowni celem dostosowania do przechowywania opału.Efektem realizacji projektu będzie:- zmniejszenie zapotrzebowania na energię o 282 MWh/rok- redukcja ekwiwalentu CO2 o 197,27 ton/rok- oszczędność kosztów ogrzewania na poziomie 20 224,82 zł/rok- redukcja emisji pyłów o 1649,52 kg/rok (Polish)
    0 references
    The aim of the project is to increase the energy efficiency of the Housing Cooperative’s buildings in England. The investment in question consists of the thermal renovation of two residential buildings (61 and 62) and the thermal modernisation of the local district heating network. In both facilities, the following works are planned: the insulation of the external walls, the insulation of the outer wall, the insulation of the outer walls, the warming of the external walls of the basement, — the external door exchange, the insulation of external walls on the ground, and the modernisation of the coal boiler is planned for the biomass boiler, which is located at Building No 61, the boiler is designed to provide heat for both houses. With regard to the local district heating network, it is planned to replace the existing duct of the district heating network into a new pre-insulated pipe of reduced diameter adapted to the current demand for heat. It is also planned to change the energy carrier from hard coal to biomass — pellets with the renovation of a boiler plant with a view to adjusting for storage. the project will: — reduce energy demand by 282 MWh/year- reduction of CO2 equivalent by 197,27 tonnes/year — heating cost savings of 20 224.82 kg/year — reduction of dust emissions by 1 649.52 kg/year. (English)
    0 references

    Identifiers

    RPPK.03.02.00-18-0130/16
    0 references