“Construction of infrastructure for walking — cycling in the Opole county — stage II and construction of a hub in the municipality of Lewin Brzeski” (Q114854)

From EU Knowledge Graph
Revision as of 08:12, 10 March 2020 by DG Regio (talk | contribs) (‎Created claim: summary (P836): The aim of the project is to improve the quality of life of the local community by reducing air pollution in the Opole area, as a result of the expansion of infrastructure for cycling, and by the construction of hubs and parks of Bike & Ride and park & Ride, combining individual means of transport with public transport by rail and buses. In the context of the implementation of the project: infrastructure for pedestrians and cyclists for the tota...)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
“Construction of infrastructure for walking — cycling in the Opole county — stage II and construction of a hub in the municipality of Lewin Brzeski”
Project in Poland financed by DG Regio

    Statements

    0 references
    39,791,064.92 zloty
    0 references
    9,549,855.5808 Euro
    13 January 2020
    0 references
    49,794,586.25 zloty
    0 references
    11,950,700.7 Euro
    13 January 2020
    0 references
    81.14 percent
    0 references
    21 December 2016
    0 references
    31 December 2021
    0 references
    POWIAT OPOLSKI
    0 references
    Przedmiotem projektu jest poprawa jakości życia społeczności lokalnej poprzez ograniczenie zanieczyszczenia powietrza na obszarze Aglomeracji Opolskiej, wskutek rozbudowy infrastruktury dla ruchu rowerowego, a poprzez budowę centrów przesiadkowych oraz parkingów Bike&Ride i Park&Ride łączenie indywidualnych środków transportu z publicznym transportem zbiorowym jakimi są kolej i autobusy. W ramach realizacji projektu powstanie: infrastruktura pieszo-rowerowa o łącznej dług. 38,52 km (w tym wybudowanej 33,19km, przebudowanej 2,80km i wyznaczonej 2,53km); 6 park. Bike&Ride zlokalizowanych w pobliżu stacji kolej. (Suchy Bór, Tarnów Op., Lewin Brzeski, Tułowice i Turawa) oraz przystanku autobus. (Prószków-Pomologia). Łącznie powstanie 160 stanowisk dla rowerów w ramach park. Bike&Ride; 4 parkingi Park&Ride zlokalizowanych w pobliżu stacji kolej (Suchy Bór, Tarnów Op., Lewin Brzeski, Tułowice), na łączną liczbę 66 miejsc postojowych dla samochodów w tym 5 miejsc dla osób niepełnosprawnych; centrum przesiadkowe w m. Lewin Brzeski przy dworcu kolejowym obsługującym główną linię relacji Opole – Wrocław; centrum przesiadkowe w m. Tułowice przy stacji kolej. obsługującej linię relacji Opole – Nysa; centrum przesiadkowe w m. Suchy Bór przy stacji kolej. obsługującej linię relacji Opole –Fosowskie. Projekt przewiduje również budowę energooszczędnego oświetlenia typu LED oraz wymianę istniejących lamp na energooszczędne wzdłuż planowanej do budowy infrastruktury pieszo-rowerowej oraz uzupełnienie energooszczędnego oświetlenia ulicznego na terenie miasta Lewin Brzeski (ul.: Rolna, Pocztowa, Krasickiego, Marzanny, Wiśniowa, Leśna, Wiosenna, Rzemieślnicza, Szafirowa, Kościuszki, Ochronna, Kościuszki, Mickiewicza, Zamkowa, Cicha, Jesienna, Słowackiego, Akacjowa, Kolejowa). W ramach projektu wykonane zostaną niezbędne roboty związane z poszerzeniem jezdni dróg powiat. (1702O, 1703O, 1705O, 1712O, 1756O) i wojewódzkich (414, 461), na odc. wzdłuż których powstaną drogi dla rowerów (Polish)
    0 references
    The aim of the project is to improve the quality of life of the local community by reducing air pollution in the Opole area, as a result of the expansion of infrastructure for cycling, and by the construction of hubs and parks of Bike & Ride and park & Ride, combining individual means of transport with public transport by rail and buses. In the context of the implementation of the project: infrastructure for pedestrians and cyclists for the total debt. 38.52 km (including 33.19 km built, reconstructed 2.80 km and 2.53 km run); 6 park. Bike & Ride located near the railway station. (dry Bór, Tarnów Op., Lewin Brzeski, Tułowice and Turawa) and bus stop. (Drószkoliogia). In total, there will be 160 posts for bicycles within the park. Bike & Ride; 4 parks of Park & Ride located near the railway station (Suchy Bór, Tarnów Op., Lewin Brzeski, Tułowice), for a total number of 66 parking spaces for the cars, including 5 places for disabled passengers; connecting hub in M. Lewin Brzeski, railway station serving the main line of Opole — Wrocław; traffic centre in Tułowice at the station railway station operating Opole — Nysa; connecting hub in m. dry Bór at a queuing station. operating the Odomowskie link line. The project also provides for the construction of efficient LED lighting and the replacement of existing lighting lamps on energy efficient along the planned infrastructure for the transport of pedestrians and cyclists and the completion of the efficient street lighting in the town of Lewin Brzeski (ul.: Agricultural, Poczty, Kraisiki, marzanna, Wiśniowa, Leśna, Spring, Craftsmen, szałowa, Kościuszki, Protective, Kościuszki, Mickiewicza, Zamkowa, cich, autumn, Slovak, acacia, railway). The project will provide the necessary works related to the widening of the road road. (1702o, 1703O, 1705O, 1712O, 1756O) and provincial (414, 461), on which the road will be created for bicycles (English)
    0 references

    Identifiers

    RPOP.03.01.02-16-0005/16
    0 references