Work on the deployment of public networks of the type FTTH (fibre optics) (Q3695803)

From EU Knowledge Graph
Revision as of 10:34, 22 November 2021 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in en: translated_label)
Jump to navigation Jump to search
Project Q3695803 in France
Language Label Description Also known as
English
Work on the deployment of public networks of the type FTTH (fibre optics)
Project Q3695803 in France

    Statements

    0 references
    10,990,885.16 Euro
    0 references
    49,710,639.3 Euro
    0 references
    22.11 percent
    0 references
    13 June 2017
    0 references
    31 December 2020
    0 references
    Conseil départemental de Saône-et-Loire
    0 references
    Avec l'adoption d'une stratégie d'aménagement numérique visant à déployer progressivement le très haut débit en deux étapes 2020 puis 2022, sous maîtrise d'ouvrage départementale, sur l'ensemble de la Saône-et-Loire hors territoires préemptés par les opérateurs privés, le Département s'est fixé comme objectifs prioritaires de redynamiser l'économie locale , encourager l'innovation industrielle, répondre aux besoins de proximité et de mobilité. Ainsi, le Conseil départemental a validé un projet de création de 72 768 prises FTTH raccordable sur une période 2018 à 2020. (French)
    0 references
    With the adoption of a digital planning strategy aimed at gradually deploying very high-speed broadband in two stages 2020 and 2022, under departmental supervision, throughout the Saône-et-Loire region outside the pre-empted territories by private operators, the Department has set itself as priority objectives to revitalise the local economy, encourage industrial innovation, and meet the needs of proximity and mobility. Thus, the Departmental Council approved a project to create 72,768 connectable FTTH sockets over the period 2018 to 2020. (English)
    22 November 2021
    0 references

    Identifiers

    BG0014816
    0 references