Rehabilitation of social and cultural sites and public spaces in the district of: (Q114442)

From EU Knowledge Graph
Revision as of 11:51, 9 March 2020 by DG Regio (talk | contribs) (‎Created claim: summary (P836): The realisation of the investment consists of the completion of the renovation works of the public utility facilities, i.e. the TSOs’ residencies for the needs of the local population and the revitalisation of the public space in the village wall and the park in the Great Basin. The draft terms of reference are: 1. Renovation of the TSO’s reconstruction of the meeting room and social facilities in the Uwall: food and sanitation, purchase of equi...)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
Rehabilitation of social and cultural sites and public spaces in the district of:
Project in Poland financed by DG Regio

    Statements

    0 references
    2,555,806.38 zloty
    0 references
    613,393.5312 Euro
    13 January 2020
    0 references
    4,096,141.86 zloty
    0 references
    983,074.0463999999 Euro
    13 January 2020
    0 references
    65.0 percent
    0 references
    30 April 2018
    0 references
    30 June 2020
    0 references
    GMINA SZCZUROWA
    0 references
    Realizacja inwestycji polega na wykonaniu prac remontowychrozbudowy w obiektach użyteczności publicznej tj. remizach OSP i domach ludowych przeznaczonych dla potrzeb lokalnej społeczności oraz rewitalizacji przestrzeni publicznej w Uściu Solnym i parku w Strzelcach Wielkich. Projekt swym zakresem obejmuje:1. Remont remizy OSP w Uściu Solnym remont sali spotkań i zaplecza socjalnego: kuchnia i sanitariaty, zakup wyposażenia, remont instalacji wod.kan., c.o., elektrycznej, monitoring;2. Remont domu ludowego Włoszyn remont zaplecza kuchennego i w.c, elewacja, wymiana stolarki okiennej i drzwiowej, schody, barierki, podjazd dla niepełnosprawnych, zagospodar. otoczenia, monitoring;3. Remont remizy OSP w Kwikowie ocieplenie, elewacja, remont dachu, rozbudowa budynku, taras, ogrodzenie, monitoring, przebudowa linii telefonicznej, zagospodarowanie otoczenia;4. Rewitalizacja rynku w Uściu Solnym plantowanie terenu, zieleń, monitoring obejmuje zagospodarowanie terenów zieleni o pow. 1,12 ha w zakresie wykonania nowych nasadzeń zieleni niskiej i wysokiej;5. Rewitalizacja parku wokół dworku w Strzelcach Wielkich zagospodarowanie terenu dz. 11934, 11933 m.in alejki, mała architektura, monitoring, wykonanie prac dendrologicznych;6. Remont domu ludowego w Kopaczach Wielkich iniekcja, termomodernizacja, zaplecze sanitarne i kuchenne, remont i przebudowa pomieszczeń, zagospodarowanie otoczenia wraz z oświetleniem parkowym;7. Remont budynku domu ludowego w Strzelcach Wielkich elewacja budynku, docieplenie stropu, stolarka okienna, zadaszenie wejścia, remont pomieszczeń na parterze.Wnioskodawca na potrzeby realizacji projektu dysponuje niezbędnymi aktualnymi projektami budowlanymi opracowanymi zgodnie z Ustawą z dnia 7 lipca 1994 r. Prawo budowlane Dz. U. z 2006 r., Nr 156, poz. 1118, z późn. zm., w zakresie prac rewitalizacyjnych parku w Strzelcach Wlk. w oparciu o ustawę o ochronie przyrody, Prawo ochr. środowiska oraz pozwolenie konserwatorskie. (Polish)
    0 references
    The realisation of the investment consists of the completion of the renovation works of the public utility facilities, i.e. the TSOs’ residencies for the needs of the local population and the revitalisation of the public space in the village wall and the park in the Great Basin. The draft terms of reference are: 1. Renovation of the TSO’s reconstruction of the meeting room and social facilities in the Uwall: food and sanitation, purchase of equipment, renovation of the water supply, can., electricity, monitoring, 2. The renovation of the people’s home in Italy, the renovation of kitchen and door premises, the replacement of window and door frames, stairs, barriers, support for the disabled, the environment, monitoring, 3. Refurbishment of the TSOs in the heating tanks, the façade, the renovation of the roof, extension of the building, terrace development, monitoring, reconstruction of the telephone line, the installation of the environment, and 4. The regeneration of the market in the Soil Planning Site Planning, green, monitoring includes the landscaping of green spaces. 1.12 ha for the implementation of new low and high green plantings 5. Rehabilitation of the park around a station in Strzelce in the region of Great Britain. 11 934,11933, inter alia, aleas, small architecture, monitoring, dental work, 6. Renovation of the population of the folk house in the form of thermal modernisation, thermal modernisation, sanitary and kitchen facilities, renovation and alteration of premises, conditioning of the environment with steam lighting, 7. Renovation of the building of the popular house in Strzelice, the construction of a building, the insulation of the floor, the roof of window frames, the roof of the entrance, the renovation of the premises, the applicant for the project will have at its disposal the necessary updated construction projects drawn up in accordance with the Act of 7 July 1994 on the Construction Law. Journal of Laws 2006/156, item 1118, as amended, in the area of regeneration work of the Strzelice Park, based on the Nature Conservation Act, the Environmental Protection Law and the conservation permit. (English)
    0 references

    Identifiers

    RPMP.11.02.00-12-0747/17
    0 references