Regeneration in the municipality of Bochnia (Q114429)

From EU Knowledge Graph
Revision as of 11:44, 9 March 2020 by DG Regio (talk | contribs) (‎Created claim: summary (P836): The scope of the project: Regeneration in Bochnia comprises four revitalisation measures: 1. Reconstruction and extension of the Team of the Gminne District in Henryk Sienkiewicz, in Bogucze with pre-school project no. 2 in the GPR2. Together we can help to modernise and adapt the building of the old school in Cikowicki together with the building site to the place where the project No 5 in the GPR3 is active. Activating the local community throu...)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
Regeneration in the municipality of Bochnia
Project in Poland financed by DG Regio

    Statements

    0 references
    1,826,656.95 zloty
    0 references
    438,397.66799999995 Euro
    13 January 2020
    0 references
    2,810,241.55 zloty
    0 references
    674,457.972 Euro
    13 January 2020
    0 references
    65.0 percent
    0 references
    3 April 2017
    0 references
    15 November 2019
    0 references
    GMINA BOCHNIA
    0 references
    Zakres projektu pn. Rewitalizacja w Gminie Bochnia obejmuje cztery działania rewitalizacyjne:1. Przebudowę i rozbudowę Zespołu Szkół Gminnych im. Henryka Sienkiewicza w Bogucicach o przedszkole przedsięwzięcie nr 2 w GPR2. Razem możemy więcej modernizację i adaptację budynku dawnej szkoły w Cikowicach wraz z terenem wokół budynku na miejsce aktywnego spędzania czasu przedsięwzięcie nr 5 w GPR3. Aktywizacja społeczności lokalnej poprzez kompleksową przebudowę przestrzeni publicznej w Ostrowie Szlacheckim przedsięwzięcie nr 18 w GPR4. Z myślą o dzieciach modernizacja budynku przedszkola w Moszczenicy wraz z zagospodarowaniem otoczenia przedsięwzięcie nr 9 w GPR.Elementem wspólnym nowo powstałej infrastruktury obszaru rewitalizacji będzie utworzenie zaplecza technicznego do rozwiązywania problemów społecznych służących aktywizacji społecznej, środowiskowej, międzyludzkiej czyli wzmocnienia więzi społecznych. Prawidłowo rozwinięta infrastruktura publiczna, poprzez organizację różnego rodzaju funkcjonalności, bazy instytucjonalnej dla mieszkańców, wydarzeń oraz imprez służących integracji lokalnej społeczności, umożliwi skuteczną walkę z marginalizacją oraz wykluczeniem społecznym mieszkańców. Ilość oraz stan infrastruktury ogólnodostępnej do korzystania dla mieszkańców na obszarze zdegradowanym w Gminie jest kiepski, wskazane zatem jest podjęcie działań zmieniających ten stan.Powierzchnie poddawane rewitalizacji: a Bogucice: 591,30 m2, tj. 0,059 hab Cikowice 665,82 m2, tj. 0,067 ha:c Moszczenica 235,86 m2, tj. 0,024 ha: d Ostrów Szlachecki: 535,70 m2, tj. 0,053 ha:Łączna powierzchnia obszarów objętych rewitalizacją wynosi: 0,059 ha 0,067 ha 0,024 ha 0,053 ha 0,203 ha (Polish)
    0 references
    The scope of the project: Regeneration in Bochnia comprises four revitalisation measures: 1. Reconstruction and extension of the Team of the Gminne District in Henryk Sienkiewicz, in Bogucze with pre-school project no. 2 in the GPR2. Together we can help to modernise and adapt the building of the old school in Cikowicki together with the building site to the place where the project No 5 in the GPR3 is active. Activating the local community through a comprehensive overhaul of the public space in Ostrowie of the nobility No 18 in the GPR4. With a view to the children being upgraded in the Moszczerica nursery, together with the surrounding area, project No 9 in the GPR.Elevation of the common newly created infrastructure for the regeneration area will be the creation of technical facilities to address social, environmental, people-to-people links, i.e. the strengthening of social links. Properly developed public infrastructure, through the organisation of different types of functionality, institutional base for residents, events and events to integrate local communities, will make it possible to fight against marginalisation and social exclusion. The quantity and condition of the infrastructure which is generally available for use by residents in a degraded area in the Gmina is poor; it is therefore appropriate to take action to change the status of: and Bogucice: 591.30 m², i.e. 0,059 Cikowice 665.82 m², i.e. 0.067 ha: c Moszczenica 235.86 m², i.e. 0.024 ha: D Cluster of nobility: 535.70 m², i.e. 0.053 ha: total area of regeneration areas: 0.059 ha 0.067 ha 0.024 ha 0.053 ha 0.203 ha (English)
    0 references

    Identifiers

    RPMP.11.02.00-12-0696/17
    0 references