Thermal modernisation of public buildings located in the towns of Płock — Bragamura and Płock — Cologne (Q109057)

From EU Knowledge Graph
Revision as of 11:22, 9 March 2020 by DG Regio (talk | contribs) (‎Created claim: summary (P836): The project involves the thermal modernisation of the buildings located in the towns of P³onium-Bramuira and Płoni-Cologne, located in the village of Płock rural municipality. The buildings covered by this project are the Primary School in Płock, Poland, and the School in Płock. The main problem in the project is the poor energy efficiency of buildings and a low heating standard and functionality. The scope of the work envisaged is dictated by t...)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
Thermal modernisation of public buildings located in the towns of Płock — Bragamura and Płock — Cologne
Project in Poland financed by DG Regio

    Statements

    0 references
    908,096.11 zloty
    0 references
    217,943.06639999998 Euro
    13 January 2020
    0 references
    1,479,733.09 zloty
    0 references
    355,135.9416 Euro
    13 January 2020
    0 references
    80.0 percent
    0 references
    1 December 2015
    0 references
    30 December 2017
    0 references
    GMINA PŁONIAWY-BRAMURA
    0 references

    52°58'47.3"N, 21°3'46.8"E
    0 references
    Projekt zakłada termomodernizację budynków położonych w miejscowościach Płoniawy-Bramura i Płoniawy-Kolonia, znajdujących się na terenie gminy wiejskiej Płoniawy-Bramura. Budynki objęte niniejszym projektem to Szkoła Podstawowa w Płoniawach-Bramurze i Przedszkole w Płoniawach-Bramurze. Głównym problemem w projekcie jest niska efektywność energetyczna budynków oraz niski standard cieplny i obniżona funkcjonalność. Zakres planowanych prac podyktowany jest następującymi potrzebami: ocieplenia ścian, podłóg, stropodachów i stropów, wymiany stolarki drzwiowej, modernizacji instalacji grzewczej oraz instalacji przygotowania ciepłej wody użytkowej, modernizacji instalacji oświetleniowej, zwiększenie udziału odnawialnych źródeł energii w bilansie energetycznym, poprawy estetyki budynków, ograniczenie emisji zanieczyszczeń do powietrza atmosferycznego. W związku z powyższym, obecny stan techniczny wymaga podjęcia działań termomodernizacyjnych. Zakres projektu będzie kompleksową odpowiedzią na zidentyfikowane potrzeby i problemy. Przedmiotem projektu jest: ocieplenie ścian zewnętrznych i fundamentowych oraz ścian piwnicy, ocieplenie stropodachów i stropów, ocieplenie podłóg, wymiana drzwi zewnętrznych, montaż zaworów podpionowych i zaworów termostatycznych oraz liczników ciepła, instalacje kolektorów słonecznych do przygotowywania ciepłej wody użytkowej wraz z montażem liczników, wymiana oświetlenia na energooszczędne, montaż paneli fotowoltaicznych. Beneficjentem końcowym projektu jest Gmina Płoniawy-Bramura, a beneficjentem ostatecznym są wszyscy mieszkańcy Gminy, a także pracownicy i użytkownicy budynków. Głównym celem projektu jest poprawa jego efektywności energetycznej oraz wykorzystanie odnawialnych źródeł energii. Za poszczególne etapy projektu, tj. złożenie wniosku, zamówienia publiczne, monitoring, rozliczanie, nadzór odpowiadać będą pracownicy Urzędu Gminy Płoniawy-Bramura (Inspektor Urzędu Gminy). Za eksploatacje odpowiedzialna będzie Dyrekcja Zespołu Szkół. (Polish)
    0 references
    The project involves the thermal modernisation of the buildings located in the towns of P³onium-Bramuira and Płoni-Cologne, located in the village of Płock rural municipality. The buildings covered by this project are the Primary School in Płock, Poland, and the School in Płock. The main problem in the project is the poor energy efficiency of buildings and a low heating standard and functionality. The scope of the work envisaged is dictated by the following needs: warming of walls, floors, costumes and ceilings, replacement of doors for doors, modernisation of heating systems and installation of hot water supply, modernisation of lighting installations, increasing the share of renewable energy sources in the energy balance, improving the aesthetics of buildings, reducing emissions to ambient air. In the light of the above, the current technical condition requires the adoption of the thermomodernisation measures. The scope of the project will be a comprehensive response to the identified needs and problems. The project involves: insulation of external and fundamental walls and basement walls, insulation of floors and ceilings, insulation of floors, replacement of external doors, fitting of vertical valves and thermostatic valves and heat meters, solar collectors installations for hot water storage, replacement of lighting panels, installation of solar panels. The final beneficiary of the project is the Municipality of Płock — Bramuira and the final beneficiary is all inhabitants of the municipality, as well as the staff and users of the buildings. The main objective of the project is to improve its energy efficiency and the use of renewable energy sources. For the various stages of the project, i.e. the submission of the application, public procurement, monitoring, clearance, supervision will be carried out by the staff of the Office of the Municipality of Płock Bramura (Inspector of the Municipal Office). The Division of the Group of Schools will be responsible for the operations. (English)
    0 references

    Identifiers

    RPMA.04.02.00-14-5406/16
    0 references