Construction and upgrading of water treatment and water supply infrastructure in the Wólka Łańchowska, water catchment area (Q105691)
Jump to navigation
Jump to search
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Construction and upgrading of water treatment and water supply infrastructure in the Wólka Łańchowska, water catchment area |
Project in Poland financed by DG Regio |
Statements
499,116.5 zloty
0 references
1,343,261.0 zloty
0 references
85.0 percent
0 references
24 November 2015
0 references
31 July 2018
0 references
GMINA MILEJÓW
0 references
Głównym celem projektu jest zwiększenie dostępności (szczególnie w przypadku suszy) wody dla odbiorców indywidualnych oraz poprawa jakości wód dostarczanych na cele socjalno - bytowe i przemysłowe poprzez budowę i modernizację infrastruktury uzdatniania i poboru wody stacji wodociągowej w Wólce Łańcuchowej, gm. Milejów. Na zakres projektu składa się budowa i modernizacja infrastruktury uzdatniania i poboru wody stacji wodociągowej w Wólce Łańcuchowskiej w Gminie Milejów. Celem szczegółowym projektu jest poprawa warunków życia mieszkańców Gminy Milejów oraz warunków działania przedsiębiorców lokalnych poprzez działania mające na celu zniesienie utrudnień związanych z użytkowaniem sieci wodociągowej szczególnie w okresach suszy i niedoborów wody. Jest to szczególnie istotne, gdyż główne przedsiębiorstwa na terenie Gminy Milejów są wysoce wodochłonne (przetwórstwo rolno-spożywcze). Realizacja celu głównego i szczegółowego zapewni poprawę jakości życia mieszkańców oraz wpłynie pozytywnie na ochronę środowiska naturalnego poprzez znaczące ograniczenie strat wody. Zapewnienie stabilnej i nieprzerwanej pracy sieci wodociągowej zmniejszy ryzyka chorób ludzi w Gminie Milejów spowodowanych złą jakością dostarczanej wody. Tak skonstruowany cel projektu w największym stopniu odpowiada zidentyfikowanym w ramach przeprowadzonych analiz problemom zarówno głównym jak i szczegółowym. W ramach inwestycji realizowane będą następujące zadania: budowa zbiornika wyrównawczego 100 m3, rozbudowa/przebudowa budynku ujęcia wody, aerator, chlorator, kompleksowa przebudowa centrali energetycznej i całej instalacji elektrycznej w obiekcie (w tym instalacji PV), zagospodarowanie terenu, w tym budowa zbiornika bezodpływowego, systemy monitoringu, dokumentacja projektowa w tym koncepcja architektoniczna, studium wykonalności, zarządzanie projektem, nadzór inwestorski, promocja. Realizacja wszystkich zaplanowanych zadań umożliwi osiągnięcie kluczowych rezultatów projektu i realizację celu głównego (Polish)
0 references
The main objective of the project is to increase the availability (especially in the event of drought) of water to individual consumers and to improve the quality of water supplied for social — private and industrial purposes, by building and upgrading the infrastructure for the treatment and abstraction of water supply stations in the Wólka chain, including in the City of Mleców. The project consists of the construction and upgrading of infrastructure for the treatment and abstraction of water from the water station in Wólka Łańchowska in the municipality of Mleców. The specific objective of the project is to improve the living conditions of the inhabitants of the Municipality of Milleów and the conditions of operation of local businesses by means of measures aimed at eliminating the handicaps associated with the use of the water supply network, particularly during periods of drought and water scarcity. This is particularly important since the main enterprises in the Municipality of Mleców are highly water-intensive (agri-food processing). Implementation of the main and specific objective will improve the quality of life of the inhabitants and contribute to the protection of the environment by reducing significantly the loss of water. Ensuring a stable and continuous operation of the water supply network will reduce the risk of human disease in the municipality of Milleach due to the poor quality of the water supplied. The project’s aim is to the greatest extent possible to respond to the issues identified in the analysis of both the main and specific problems identified. The following tasks will be carried out as part of the investment: construction of a compensation reservoir of 100 m³, extension/reconstruction of the water treatment building, aerator, chlorator, comprehensive refurbishment of the energy switchboard and the entire electrical installation in the facility (including the installation of PV), land management including construction of septic tank, monitoring systems, project documentation including architectural design, feasibility study, project management, investor supervision, promotion. The achievement of all the planned tasks will make it possible to achieve the key deliverables of the project and the main objective pursued. (English)
0 references
Identifiers
RPLU.06.04.00-06-0070/15
0 references