Facilities for the EMP of Saint-Brieuc (Q3687825)

From EU Knowledge Graph
Revision as of 19:42, 18 November 2021 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in en: translated_label)
Jump to navigation Jump to search
Project Q3687825 in France
Language Label Description Also known as
English
Facilities for the EMP of Saint-Brieuc
Project Q3687825 in France

    Statements

    0 references
    1,254,543.47 Euro
    0 references
    6,400,732.0 Euro
    0 references
    19.6 percent
    0 references
    1 May 2016
    0 references
    31 December 2018
    0 references
    CA SAINT-BRIEUC ARMOR AGGLOMERATION
    0 references

    48°30'50.80"N, 2°45'37.19"W
    0 references
    Dans le cadre de la transformation de la gare de Saint-Brieuc en pôle d'échanges multimodal (PEM), ce projet comprend en la création d'une passerelle piétonne permettant de traverser le faisceau ferroviaire et d'accéder aux quais ainsi que la création d’un parvis au Sud des voies ferrées en miroir du parvis Nord existant. (French)
    0 references
    As part of the transformation of the Saint-Brieuc train station into a multimodal exchange hub (PEM), this project includes the creation of a pedestrian walkway to cross the railway beam and access to the platforms, and the creation of a foreword to the south of the tracks mirroring the existing North square. (English)
    18 November 2021
    0 references
    SAINT-BRIEUC
    0 references

    Identifiers

    2014FR16M2OP003-655
    0 references