No label defined (Q3675585)

From EU Knowledge Graph
Revision as of 16:27, 18 November 2021 by DG Regio (talk | contribs) (‎Created claim: summary (P836): The project consists of the creation of an ecological corridor crossing from north to south the activity park of the aze. As part of the development of the first phase of extension, covering about 15 hectares, the Sympa planned the creation of a vegetated strip of between 35 and 70 m wide that will cross the Park from the North to the South in order to strengthen the ecological continuity between the valleys of the aze and the Morge., translated...)
Jump to navigation Jump to search
Project Q3675585 in France
Language Label Description Also known as
English
No label defined
Project Q3675585 in France

    Statements

    0 references
    301,661.0 Euro
    0 references
    671,941.07 Euro
    0 references
    44.89 percent
    0 references
    10 May 2016
    0 references
    30 June 2020
    0 references
    Syndicat Mixte du Parc de l'Aize ZAC 2
    0 references
    Le projet consiste en la création d'un corridor écologique traversant du Nord au Sud le Parc d'activités de l'Aize. Dans le cadre de l'aménagement de la première phase d'extension, portant sur une quinzaine d'hectares, le Sympa a prévu la création d'une bande végétalisée d'une largeur comprise entre 35 et 70 m qui traversera le Parc du Nord au Sud afin de conforter la continuité écologique entre les vallons de l'Aize et de la Morge. (French)
    0 references
    The project consists of the creation of an ecological corridor crossing from north to south the activity park of the aze. As part of the development of the first phase of extension, covering about 15 hectares, the Sympa planned the creation of a vegetated strip of between 35 and 70 m wide that will cross the Park from the North to the South in order to strengthen the ecological continuity between the valleys of the aze and the Morge. (English)
    18 November 2021
    0 references

    Identifiers

    AV0007300
    0 references