Improvement of the energy efficiency of the company BUILDING Piotr Skrzypek (Q105101)

From EU Knowledge Graph
Revision as of 09:57, 6 March 2020 by DG Regio (talk | contribs) (‎Created claim: summary (P836): The idea is to improve the efficiency of the use of wood, which is in line with transnational climate action. GR. doc.: joinery and budgets, municipalities, and tourists. Objective: Improve the efficiency of the front side. Construction Piotr Skrzypek. Objectives of the result: growth of heat and electricity, reduction in end-use consumption, increased production and heating. RES, enhanced capacity (el. and heat.) from source (s). Reduction of t...)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
Improvement of the energy efficiency of the company BUILDING Piotr Skrzypek
Project in Poland financed by DG Regio

    Statements

    0 references
    938,887.52 zloty
    0 references
    225,333.0048 Euro
    13 January 2020
    0 references
    1,776,664.14 zloty
    0 references
    426,399.39359999995 Euro
    13 January 2020
    0 references
    65.0 percent
    0 references
    9 May 2017
    0 references
    30 November 2018
    0 references
    BUDOWNICTWO PIOTR SKRZYPEK
    0 references
    Ideą proj. jest poprawa efektyw. en. przeds. drzewnego co jest zgodne z ponadnarodowymi działaniami na rzecz ochrony klimatu. Gr. doc.: przeds. stolarskie i bud., miesz. gminy, oraz turyści. Cel gł.: Poprawa efektyw. en. przeds. BUDOWNICTWO Piotr Skrzypek. Cele rezultatu: wzrost oszczędn. en. cieplnej i elektr, zmniejszenie zużycia en. końcowej, zwiększ. prod. en. el. i ciepl. z nowo wybudow. inst. wykorzyst. OZE, zwiększona zdolność wytwa. en. (el. i ciepl.) ze źródeł odn. Spadek emisji gazów ciepl. Wskaźniki: 1. Ilość zaoszcz. en. ciepln. 191,5GJ/r 2.Ilość zaoszcz. en. el. 84,1MWh/rok, 3. Zmn. zużycia en. k. w wyniku r. proj. 494,24GJ/r. 4. Produkcja en. el. 33,18 MWhe/r., cie.33,61 z nowo wybud/nowych mocy wytwórczych inst. wykorz. OZE: 5. Dodatkowa zdolność wytwarz. en. ze źródeł odn. (CI30): 66,79 MW 2. Szacow. roczny spadek emisji gazów ciepl. (CI34): 56,62 t. ekw. CO2/rok Cele produktu: wzrost l. przeds. otrzymujących wsparcie i przeds., które w wyniku wsparcia poprawiły efektywności energet. oraz l. zmodernizowanych energ. budynków o zwiększonej pow. użytk. poddanej termom.i oraz zwiększona l. wybud. jedn. wytwarz. en. elektr. z i en ciepl. OZE Wskaźniki: l. przeds. otrzymujących wsp. 1szt. l. przeds. o poprawionej efekt. en. 1szt. l. zmodernizowanych energ. budynków 1szt. pow. użytk. bud. poddanych term. 127,48m2 l. wybud. jedn. wytwarz. en. elektr. z OZE 1 szt. l. wybud. jedn. wytwarz. en. ciepl. z OZE 1szt. Produkty: budynek suszarni o wsp. przenikania ciepła ścian 0,16 W/m2K z syst. zarz. en, 1jedn. ciepl. -kocioł na biomasę800 KW ; 1jedn. elektr. (p. fotowoltaiczne 160szt.) o mocy do 40 kW, energooszcz. linia techn. W ramach zadania: audyt energetyczny, Rob. bud. - montaż 1jedn. wytwarz. en. cieplnej z biomasy oraz działania termom.; en. słońca: Dostawa i montaż 1jedn. wytwarz. en. elek. (fotowoltaika), wymiana urządzeń linii techn. oraz syst. zarządz. en. Inwestycja jest zgodna z Programem ochrony powietrza dla strefy lubelskiej z XI. 2013 r. (Polish)
    0 references
    The idea is to improve the efficiency of the use of wood, which is in line with transnational climate action. GR. doc.: joinery and budgets, municipalities, and tourists. Objective: Improve the efficiency of the front side. Construction Piotr Skrzypek. Objectives of the result: growth of heat and electricity, reduction in end-use consumption, increased production and heating. RES, enhanced capacity (el. and heat.) from source (s). Reduction of thermal gas emissions. Indicators: 1. Amount saved. 191,5GJ/r 2.Quantity saved. 84.1 MWh/year, 3. Reductions in consumption of k. as a result of the reaction. 494,24GJ/r. 4. Manufacture of steel. 33,18 MWhe/r.,.33,61 newly build/new power cord generation capacity. RES: 5. Additional capacity of en. from source. (CI30): 66.79 MW 2. Estimated annual decrease of thermal gas emissions. (CI34): 56,62 tonnes in. CO2/rok Product objectives: the increase of the buildings to be supported by energy efficiency and the improvement of the energy efficiency of buildings. RES Indicators: L. (a) and (b). 1 pcs. 1 units of modernised energy. buildings are under construction. 127.48 m². Products: heating building with 0,16 W/m2K heat transmission from wall heat. Boiler: a biomass boiler; 1one electricity (P. Solar 160 t.) with a power output of up to 40 kW, power technology line. We have received information that as part of the following task: energy audit, Rob.bud. Installation of 1one biomass heat output from biomass heat and activities; sun: Supply and installation of the 1one. (photovoltaic), engineering of technical line equipment and syst. en. order en. The investment shall be compatible with the air protection programme for Lubelskie of XI. Q2013 (English)
    0 references

    Identifiers

    RPLU.05.01.00-06-0047/17
    0 references