Thermal modernisation of public utilities in the municipality of Lissevo (Q98181)

From EU Knowledge Graph
Revision as of 07:44, 6 March 2020 by DG Regio (talk | contribs) (‎Created claim: summary (P836): The project is a thermo-modernisation of 4 public utilities in the municipality of Liszewo (multi-purpose pavilion in Lisewo, Barley, St, in Mhost and bud. TSOs in Lima). The buildings were put into service in the 70s and 90s. They are not insulated, and a large part of the window and door frames need to be replaced. There is a low level of development of RES and too high demand for energy. The aim of the project is to increase the energy effici...)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
Thermal modernisation of public utilities in the municipality of Lissevo
Project in Poland financed by DG Regio

    Statements

    0 references
    1,143,945.85 zloty
    0 references
    274,547.004 Euro
    13 January 2020
    0 references
    1,470,779.17 zloty
    0 references
    352,987.0008 Euro
    13 January 2020
    0 references
    81.64 percent
    0 references
    1 September 2017
    0 references
    30 November 2019
    0 references
    GMINA LISEWO
    0 references
    Przedmiotem projektu jest termomodernizacja 4 obiektów użyteczności publicznej w gminie Lisewo(pawilon wielofunkcyjny w Lisewie, św. wiejska w Bartlewie, św. wiejska w Mgoszczu i bud. OSP w Lisewie). Budynki zostały oddane do użytku na przełomie lat 70-tych i 90-tych. Nie są ocieplone zew., a znaczna część stolarki okiennej i drzwiowej wymaga wymiany. W gm. Lisewo występuje niski poziom rozwoju OZE oraz zbyt wysokie zapotrzebowanie na energię bud. użyteczności pub. Celem projektu jest zwiększenie efektywności energetycznej obiektów w gm. Lisewo w okresie od 1 marca 2018 do 30 czerwca 2019 roku. Dzięki realizacji projektu nastąpi poprawa w infrastrukturze bud. użyteczności pub. w zakresie termomodernizacji. Przełoży się to bezpośrednio na poprawę jakości powietrza atmosferycznego oraz na zmniejszenie kosztów utrzymania bud. W ramach projektu zaplanowano przeprowadzenie prac przygotowawczych polegających na pozyskaniu niezbędnych pozwoleń i decyzji administracyjnych, opracowaniu dokumentacji tech., wybór wykonawców oraz przeprowadzenie właściwych robót bud., zarządzanie projektem i promocję przedsięwzięcia. Wsk. produktu: -Liczba zmodernizowanych energet. bud. – 4 szt.-Liczba wybudowanych jednostek wytwarzania energii cieplnej z OZE- 2 szt.-Powierzchnia użytkowa bud. poddanych termomodernizacji- 1 985,31 m2.Wsk. rezultatu: -Produkcja energii cieplnej z nowo wybudowanych instalacji wykorzyst. OZE- 463,71 MWh/rok.-Il. zaoszczędzonej energii cieplnej- 2 185,75 GJ/rok.-Zmniej. rocznego zużycia energii pierwotnej w budynkach pub.- 1 338 548,903 kWh/rok.-Szacowany roczny spadek emisji gazów ciep.- 558,68 tony równoważnika CO2.Termin realizacji projektu od od 1 marca 2018 do 30 czerwca 2019 roku. Całkowite nakłady inwestycyjne projektu wynoszą łącznie 1 470 779,17 brutto, koszty kwalifikowalne 1 401 228,72 z czego 1 195 755,43 stanowi kwotę netto, a 275 023,74 podatek od towarów i usług VAT. Do kosztów kwalifikowalnych inwestycji został zaliczony podatek VAT. (Polish)
    0 references
    The project is a thermo-modernisation of 4 public utilities in the municipality of Liszewo (multi-purpose pavilion in Lisewo, Barley, St, in Mhost and bud. TSOs in Lima). The buildings were put into service in the 70s and 90s. They are not insulated, and a large part of the window and door frames need to be replaced. There is a low level of development of RES and too high demand for energy. The aim of the project is to increase the energy efficiency of the plants in Lissevo between 1 March 2018 and 30 June 2019. The project will improve the utility of public buildings in terms of energy efficiency. This will directly contribute to the improvement of ambient air quality and to a reduction in the cost of maintaining the budget. The project is designed to carry out preparatory work to obtain the necessary permits and administrative decisions, to draw up technical documentation, to select economic operators and to carry out the appropriate work, to manage the project and to promote the project. Product: — Number of modernised energy efficiency. — 4 — Number of generation units of heat generation from EE-2 subject to thermal modernisation — 1 985.31 m². result: — Thermal energy production from newly built installations. ZE- 463.71 MWh/year-Il. saved heat energy — 2 185,75 GJ/year-Minimise annual primary energy consumption in public buildings — 1 338 548.903 kWh/rok.-Szazan annual reduction in thermal gas emissions — 558,68 tonnes of CO2-equivalent.Deadline for the project from 1 March 2018 to 30 June 2019. Total project investment is 1 470 779,17 gross, eligible costs 1 401 228,72 of which 1 195 755,43 represent a net amount and 275 023,74 VAT. The eligible costs of the investment were included in VAT. (English)
    0 references

    Identifiers

    RPKP.03.03.00-04-0023/17
    0 references