Increasing access to pre-school education in the municipality of Glolno. (Q98757)

From EU Knowledge Graph
Revision as of 07:32, 6 March 2020 by DG Regio (talk | contribs) (‎Created claim: summary (P836): The aim of the project is to increase the number of pre-school facilities in the village of stolno (rural municipality) by creating 40 new pre-school places for children at the age of 3,4,5; 2. improving access to educational services for pre-school education in the municipality of stolno (rural municipality) through the extension of the school group No 2 to work (with full social facilities) and the adaptation of the school premises to the Scho...)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
Increasing access to pre-school education in the municipality of Glolno.
Project in Poland financed by DG Regio

    Statements

    0 references
    688,500.0 zloty
    0 references
    165,240.0 Euro
    13 January 2020
    0 references
    1,217,762.51 zloty
    0 references
    292,263.0024 Euro
    13 January 2020
    0 references
    56.54 percent
    0 references
    1 June 2017
    0 references
    30 June 2018
    0 references
    GMINA STOLNO
    0 references
    Celem projektu jest zwiększenie liczby miejsc przedszkolnych na terenie Gminy Stolno (gmina wiejska) poprzez utworzenie 40 nowych miejsc wychowania przedszkolnego dla dzieci w wieku 3,4,5 lat; 2. polepszenie dostępu do usług edukacyjnych w zakresie wychowania przedszkolnego na terenie Gminy Stolno (gmina wiejska) poprzez rozbudowę Zespołu Szkół Nr 2 w Robakowie (wraz z pełnym zapleczem socjalnym) i adaptację pomieszczeń w Zespole Szkół nr 1 w Stolnie (w tym wykonanie podjazdu dla osób niepełnosprawnych oraz dostosowanie pomieszczeń WC do potrzeb przedszkolnych, w tym osób z niepełnosprawnościami) co da 40 nowych miejsc wychowania przedszkolnego (15 w Stolnie, 25 w Robakowie). Zakres prac: ZS Nr 2 w Robakowie: roboty remontowo-budowlane, zewnętrzna instalacja wodociągowa, zewnętrzna instalacja kanalizacji sanitarnej, instalacje wodociągowe, instalacje kanalizacji sanitarnej, instalacja grzewcza, instalacja wentylacji mechanicznej, instalacje elektryczne; ZS Nr 1 w Stolnie: podjazd dla osób niepełnospraw., dostosowanie WC do potrzeb dzieci w wieku przedszkolnym (w tym osób z niepełnosprawnościami). Główne produkty i rezultaty projektu: Liczba miejsc w infrastrukturze przedszkolnej:wartość bazowa:0, wartość docelowa: 40 szt. , Liczba wspartych obiektów infrastruktury przedszkolnej wartość bazowa:0szt. wartość docelowa: 2szt. , Liczba osób korzystających z objętej wsparciem infrastruktury przedszkolnej: wartość bazowa: 94 osób, wartość docelowa:134 osoby. Grupą docelową projektu są dzieci w wieku przedszkolnym oraz pracownicy OWP. Ogólny koszt projektu to 810 000,00 zł, a kwota dof. z funduszu EFRR wynosi 688 500,00 zł (85%). Wszystkie koszty są kosztami kwalifikowalnymi. Realizacja projektu jest uzasadniona ekonomicznie i stanowi odpowiedź na prognozowany wzrost zapotrzebowania na miejsca opieki przedszkolnej w Gminie Stolno. (Polish)
    0 references
    The aim of the project is to increase the number of pre-school facilities in the village of stolno (rural municipality) by creating 40 new pre-school places for children at the age of 3,4,5; 2. improving access to educational services for pre-school education in the municipality of stolno (rural municipality) through the extension of the school group No 2 to work (with full social facilities) and the adaptation of the school premises to the School Complex No 1 in the Field (including the implementation of a ramp for disabled people and the adaptation of the rooms for the purposes of pre-school needs, including persons with disabilities), as a result of the 40 new pre-school places (15 in the town of Robow). Scope of work: ZS No 2 in Robow: renovation and construction work, external water supply, external sanitary sewerage installation, water supply installations, sanitary sewage systems, heating installation, mechanical ventilation installation, electrical installations; ZS No 1 in the following tables: lift for disabled people, adapting WC to the needs of pre-school children (including people with disabilities). Main outputs and deliverables of the project: Base przedszkolnej:wartość base: 0, target: 40 units Number of pre-school infrastructure facilities supported bazowa:0szt. 2szt. Number of people using supported pre-school infrastructure: base value: 94 people, docelowa:134. The target group of the project is the pre-school children and the employees of the PLO. The total cost of the project is PLN 810 000,00 and the amount to be received from the ERDF is PLN 688 500,00 (85 %). All costs shall be eligible. The implementation of the project is economically justified and responds to the projected increase in demand for pre-school care facilities in the municipality of stolno. (English)
    0 references

    Identifiers

    RPKP.06.03.01-04-0011/17
    0 references