Development of the waste water treatment plant in the city of Dobre of Dobre. No. 107, Zdrojówka district, including the construction of a sanitary sewage system in Dobre (Q85399)

From EU Knowledge Graph
Revision as of 10:12, 4 March 2020 by DG Regio (talk | contribs) (‎Created claim: summary (P836): The project consists of an extension of the wastewater treatment plant located in m. good, Zdrojówka.As a result of the extension, the capacity of the plant will increase from 1590 p.e. to 2960 p.e..In the framework of the project, the construction of a sewerage network is planned to be constructed in m. good for a total length of 1.85 km.125 new sewage users will be connected to the newly built network., Adding English summary)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
Development of the waste water treatment plant in the city of Dobre of Dobre. No. 107, Zdrojówka district, including the construction of a sanitary sewage system in Dobre
Project in Poland financed by DG Regio

    Statements

    0 references
    2,960,705.0 zloty
    0 references
    710,569.2 Euro
    13 January 2020
    0 references
    4,630,295.09 zloty
    0 references
    1,111,270.8216 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    1 January 2014
    0 references
    30 June 2018
    0 references
    GMINA DOBRE
    0 references

    52°19'18.1"N, 21°40'42.6"E
    0 references
    Projekt obejmuje rozbudowę oczyszczalni ścieków zlokalizowanej w m. Dobre, obręb Zdrojówki. W wyniku rozbudowy przepustowość oczyszczalni wzrośnie z 1590 RLM do 2960 RLM. W ramach projektu planowana jest też budowa sieci kanalizacji sanitarnej w m. Dobre o łącznej długości 1,85 km. Do nowo wybudowanej sieci zostanie podłączonych 125 nowych użytkowników kanalizacji sanitarnej. (Polish)
    0 references
    The project consists of an extension of the wastewater treatment plant located in m. good, Zdrojówka.As a result of the extension, the capacity of the plant will increase from 1590 p.e. to 2960 p.e..In the framework of the project, the construction of a sewerage network is planned to be constructed in m. good for a total length of 1.85 km.125 new sewage users will be connected to the newly built network. (English)
    0 references

    Identifiers

    POIS.02.03.00-00-0148/16
    0 references