Reconstruction of road within approximately 5 km of road within national road No 74 from al. 1 May (bridge over the Łabuńka river) to the river street (town of Zamość). (Q85965)

From EU Knowledge Graph
Revision as of 10:01, 4 March 2020 by DG Regio (talk | contribs) (‎Created claim: summary (P836): Reconstruction of road within approximately 5 km of road within national road No 74 from al.1 May (bridge over the Łabuńka river) to the river street (town of Zamość)., Adding English summary)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
Reconstruction of road within approximately 5 km of road within national road No 74 from al. 1 May (bridge over the Łabuńka river) to the river street (town of Zamość).
Project in Poland financed by DG Regio

    Statements

    0 references
    81,867,760.08 zloty
    0 references
    19,648,262.4192 Euro
    13 January 2020
    0 references
    96,315,011.86 zloty
    0 references
    23,115,602.8464 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    19 February 2016
    0 references
    30 November 2022
    0 references
    MIASTO ZAMOŚĆ
    0 references

    50°43'16.7"N, 23°15'34.6"E
    0 references
    Przebudowa drogi na odcinku około 5 km w ciągu drogi krajowej nr 74 od al. 1 Maja (most na rzece Łabuńka) do ulicy Szczebrzeskiej (granica miasta Zamość). (Polish)
    0 references
    Reconstruction of road within approximately 5 km of road within national road No 74 from al.1 May (bridge over the Łabuńka river) to the river street (town of Zamość). (English)
    0 references

    Identifiers

    POIS.04.02.00-00-0036/16
    0 references