Construction of the S5 express road. Kurzńsko — Wrocław (Widawa) (Q85826)

From EU Knowledge Graph
Revision as of 09:58, 4 March 2020 by DG Regio (talk | contribs) (‎Created claim: summary (P836): Construction of the S5 express road.Kurzńsko — Wrocław of 48.034 km in length, Adding English summary)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
Construction of the S5 express road. Kurzńsko — Wrocław (Widawa)
Project in Poland financed by DG Regio

    Statements

    0 references
    911,126,425.26 zloty
    0 references
    218,670,342.06239998 Euro
    13 January 2020
    0 references
    1,780,133,916.92 zloty
    0 references
    427,232,140.0608 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    1 January 2014
    0 references
    31 December 2018
    0 references
    GENERALNA DYREKCJA DRÓG KRAJOWYCH I AUTOSTRAD
    0 references

    51°7'34.7"N, 16°58'41.5"E
    0 references

    51°9'10.8"N, 16°47'53.2"E
    0 references
    Budowa drogi ekspresowej S5 odc. Korzeńsko – Wrocław o długości 48,034 km (Polish)
    0 references
    Construction of the S5 express road.Kurzńsko — Wrocław of 48.034 km in length (English)
    0 references

    Identifiers

    POIS.03.01.00-00-0005/15
    0 references