Reconstruction of the rockfall S4 of the Siede in Siedenburg. (Q3309271)

From EU Knowledge Graph
Revision as of 19:20, 24 October 2021 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in en: translated_label)
Jump to navigation Jump to search
Project Q3309271 in Germany
Language Label Description Also known as
English
Reconstruction of the rockfall S4 of the Siede in Siedenburg.
Project Q3309271 in Germany

    Statements

    0 references
    645.98 Euro
    0 references
    129,195.01 Euro
    0 references
    0.5 percent
    0 references
    1 July 2018
    0 references
    31 December 2019
    0 references
    ULV Große Aue
    0 references
    Zur Herstellung der faunistischen Durchgängigkeit in der Siede soll der Sohlabsturz S4 zu einem Raugerinne mit Beckenstruktur umgebaut werden. (German)
    0 references
    In order to produce the faunistic continuity in the boiling point, the S4 rockfall is to be converted into a roughing gutter with a pelvic structure. (English)
    24 October 2021
    0 references
    Diepholz
    0 references

    Identifiers

    DE_TEMPORARY_12056
    0 references