Intervention in the interconcelhia link Povoação – Northeast, Rehabilitation of the section of ER 1-1ª, between Garcias and Retorta Water (from Km 0.00 to Km 3.2) (Q2854021)

From EU Knowledge Graph
Revision as of 06:30, 22 October 2021 by DG Regio (talk | contribs) (‎Changed an Item: modifying budgets in portugal one item from slovenia)
Jump to navigation Jump to search
Project Q2854021 in Portugal
Language Label Description Also known as
English
Intervention in the interconcelhia link Povoação – Northeast, Rehabilitation of the section of ER 1-1ª, between Garcias and Retorta Water (from Km 0.00 to Km 3.2)
Project Q2854021 in Portugal

    Statements

    0 references
    548,232.0 Euro
    0 references
    644,979.0 Euro
    0 references
    85.0 percent
    0 references
    12 March 2015
    0 references
    6 August 2016
    0 references
    SECRETARIA REGIONAL DAS OBRAS PÚBLICAS E COMUNICAÇÕES
    0 references
    0 references
    A operação consiste numa intervenção de um troço da Estrada Regional n° 1-1.ª, nos concelhos de Povoação e Nordeste, entre Água Retorta e Garcias, com 3.2 km de extensão e uma largura de 5.60 m, integrando, na sua generalidade, trabalhos de pavimentação, sinalização rodoviária vertical e horizontal, bem como a instalação de guardas de segurança em toda a extensão da zona a intervir. (Portuguese)
    0 references
    The operation consists of an intervention of a section of the Regional Road No. 1-1.ª, in the municipalities of Povoação and Northeast, between Água Retorta and Garcias, with 3,2 km in length and a width of 5,60 m, integrating, in general, paving work, vertical and horizontal road signs, as well as the installation of safety guards throughout the area to intervene. (English)
    6 July 2021
    0 references

    Identifiers

    ACORES-07-2756-FEDER-000003
    0 references