Increase of smooth modes of mobility – Enlargement of the Bridge over the Vizela River (Q2895346)

From EU Knowledge Graph
Revision as of 20:53, 21 October 2021 by DG Regio (talk | contribs) (‎Removed claim: budget (P474): 121,525.88 euro)
Jump to navigation Jump to search
Project Q2895346 in Portugal
Language Label Description Also known as
English
Increase of smooth modes of mobility – Enlargement of the Bridge over the Vizela River
Project Q2895346 in Portugal

    Statements

    0 references
    1 January 2017
    0 references
    31 December 2018
    0 references
    MUNICIPIO DE SANTO TIRSO
    0 references
    0 references

    41°20'38.44"N, 8°28'37.92"W
    0 references
    Pretende-se melhorar a capacidade de circulação e as condições de segurança de pessoas e veículos através da ampliação da ponte e requalificação dos respetivos acessos tendo em vista a eliminação de pontos de acumulação de acidentes e o desenvolvimento de padrões de mobilidade menos poluentes. (Portuguese)
    0 references
    The aim is to improve the traffic capacity and safety conditions of persons and vehicles by extending the bridge and requalifying its accesses with a view to eliminating accident accumulation points and developing less polluting mobility patterns. (English)
    8 July 2021
    0 references
    Santo Tirso
    0 references

    Identifiers

    NORTE-05-1406-FEDER-000008
    0 references