URBAN REGENERATION REHABILITATION OF CENTRAL PUBLIC SPACES IN VIMIOSO 3TH STAGE URBAN ARRANGEMENT ON THE STREET OF RAPADOURA FROM ABOVE, PIPE STREET AND STREET OF THE NEW FOUNTAIN (Q2895201)

From EU Knowledge Graph
Revision as of 20:51, 21 October 2021 by DG Regio (talk | contribs) (‎Removed claim: budget (P474): 48,716.99 euro)
Jump to navigation Jump to search
Project Q2895201 in Portugal
Language Label Description Also known as
English
URBAN REGENERATION REHABILITATION OF CENTRAL PUBLIC SPACES IN VIMIOSO 3TH STAGE URBAN ARRANGEMENT ON THE STREET OF RAPADOURA FROM ABOVE, PIPE STREET AND STREET OF THE NEW FOUNTAIN
Project Q2895201 in Portugal

    Statements

    0 references
    1 June 2018
    0 references
    31 December 2019
    0 references
    MUNICÍPIO DE VIMIOSO
    0 references
    0 references

    41°35'2.62"N, 6°31'14.70"W
    0 references
    A operação visa a reabilitação de espaços públicos centrais localizados no núcleo antigo da vila, através da demolição de um conjunto edificado em elevado estado de degradação e ruína, e ao subsequente arranjo urbanístico da área demolida, conferindo à envolvente da igreja matriz maior dignidade e em simultâneo resolver o problema de segurança que os edifícios representam para os transeuntes, bem como a repavimentação da Rua da Fonte Nova. (Portuguese)
    0 references
    The operation aims at the rehabilitation of central public spaces located in the old town center, through the demolition of a complex built in a state of high degradation and ruin, and the subsequent urban arrangement of the demolished area, giving the church’s surrounding matrix greater dignity and simultaneously solving the security problem that the buildings represent for passersby, as well as the restoration of Rua da Fonte Nova. (English)
    8 July 2021
    0 references
    Vimioso, Vimioso
    0 references

    Identifiers

    NORTE-04-2316-FEDER-000262
    0 references