Change for LED technology fixtures – 2nd phase (Q2894482)

From EU Knowledge Graph
Revision as of 20:42, 21 October 2021 by DG Regio (talk | contribs) (‎Removed claim: budget (P474): 234,887.07 euro)
Jump to navigation Jump to search
Project Q2894482 in Portugal
Language Label Description Also known as
English
Change for LED technology fixtures – 2nd phase
Project Q2894482 in Portugal

    Statements

    0 references
    1 March 2018
    0 references
    31 December 2019
    0 references
    MUNICÍPIO DE OLIVEIRA DE AZEMÉIS
    0 references
    Q3000779 (Deleted Item)
    0 references

    40°50'20.44"N, 8°28'40.01"W
    0 references
    Com a presente operação pretende-se a melhoria da eficiência energética na iluminação pública e nos respetivos circuitos alvo de intervenção, selecionados de acordo com critérios de viabilidade técnica e económica. Irão ser substituídas as luminárias existentes por luminárias de LED de alta eficiência e montadas e eletrificadas novas luminárias LED em apoio existente. (Portuguese)
    0 references
    This operation aims to improve energy efficiency in public lighting and the respective intervention circuits selected according to technical and economic feasibility criteria. Existing luminaires will be replaced by high-efficiency LED luminaires and new LED luminaires mounted and electrified in existing support. (English)
    8 July 2021
    0 references
    Oliveira de Azeméis
    0 references

    Identifiers

    NORTE-03-1203-FEDER-000029
    0 references