Closure of Wastewater Sanitation Systems Connection to the sewage treatment plant of Pedrogão Grande (Tojeira, Valongo and Lord of the Afflicted) (Q2982804)

From EU Knowledge Graph
Revision as of 19:19, 21 October 2021 by DG Regio (talk | contribs) (‎Removed claim: budget (P474): 324,514.21 euro)
Jump to navigation Jump to search
Project Q2982804 in Portugal
Language Label Description Also known as
English
Closure of Wastewater Sanitation Systems Connection to the sewage treatment plant of Pedrogão Grande (Tojeira, Valongo and Lord of the Afflicted)
Project Q2982804 in Portugal

    Statements

    0 references
    6 January 2020
    0 references
    31 August 2021
    0 references
    APIN - EMPRESA INTERMUNICIPAL DE AMBIENTE DO PINHAL INTERIOR, E.I.M., S.A.
    0 references
    Q3054883 (Deleted Item)
    0 references
    0 references

    39°55'1.06"N, 8°8'44.02"W
    0 references
    Através de e-mail de 03-12-2019 o Beneficiário alterou a solução inicial e a operação passou a incluir a execução de 3,9 km de coletores gravíticos, 1 estação elevatória, 0,75 km de condutas elevatórias e 107 ramais domiciliários com ligação ao Subsistema de Saneamento de Pedrógão Grande e tratamento final na ETAR de Pedrógão Grande. (Portuguese)
    0 references
    Through e-mail of 03-12-2019 the Beneficiary changed the initial solution and the operation began to include the execution of 3.9 km of gravitic collectors, 1 lift station, 0.75 km of lifting ducts and 107 branches of home with connection to the Great Pedrógão Sanitation Subsystem and final treatment in the treatment plant of Pedrógão Grande. (English)
    9 July 2021
    0 references
    Pedrógão Grande, Pedrógão Grande
    0 references

    Identifiers

    POSEUR-03-2012-FC-001225
    0 references