SEALING OF BEAS DE GUADIX LANDFILL (GRANADA) (Q3259957)

From EU Knowledge Graph
Revision as of 19:02, 21 October 2021 by DG Regio (talk | contribs) (‎Changed an Item)
Jump to navigation Jump to search
Project Q3259957 in Spain
Language Label Description Also known as
English
SEALING OF BEAS DE GUADIX LANDFILL (GRANADA)
Project Q3259957 in Spain

    Statements

    0 references
    200,126.35 Euro
    0 references
    250,157.94 Euro
    0 references
    80.0 percent
    0 references
    1 February 2019
    0 references
    30 April 2020
    0 references
    JUNTA DE ANDALUCIA
    0 references

    37°16'46.63"N, 3°12'21.13"W
    0 references
    18025
    0 references
    EL PLAN DE CLAUSURA Y SELLADO CONSISTE EN LA DEFINICIÓN DE UNA OBRA DE ACONDICIONAMIENTO Y SELLADO DE LAS SUPERFICIES DEL VERTEDERO, QUE DEBEN CUMPLIR LAS SIGUIENTES NECESIDADES: REDUCCIÓN DE LOS RIESGOS AMBIENTALES, REDUCCIÓN DE LOS RIESGOS SANITARIOS, REGULARIZACIÓN DE SUPERFICIES PARA EL CONTROL DE LA INESTABILIDAD DE TALUDES, DISMINUCIÓN DE LA ACCIÓN DESTRUCTIVA POR EROSIÓN, ABRASIÓN, ARROYADEROS, ETC. Y LIMITACIÓN DE LA SATURACIÓN DEL VERTEDERO. ESTAS CONDICIONES SE ESTABLECEN BAJO LA PREMISA DE PROTECCIÓN DEL MEDIO AMBIENTE, SOBRE TODO EN CUANTO A LA POSIBLE CONTAMINACIÓN O ALTERACIÓN DE LAS AGUAS, O LOS BIENES NATURALES Y CULTURALES, Y DE LA SEGURIDAD DE LAS PERSONAS, CON INCIDENCIA ESPECÍFICA EN LA ESTABILIDAD DE LAS SUPERFICIES. LA ACTUACIÓN PROPUESTA SE DIVIDE EN: - REDACCIÓN DEL PROYECTO DE EJECUCIÓN DE LA OBRA DE SELLADO Y ESTUDIO GEOLÓGICO DEL TERRENO PARA DETERMINAR LA ESTABILIDAD DEL MISMO. -OBRAS DE SELLADO DEL VERTEDERO. ESTAS OBRAS CONSISTIRÁN EN: #RETIRADA DE VOLUMINOSOS SUPERFICIALES Y TRANSPORTE A VERTEDERO CONTROLADO Y/O TRATAMIENTO PARA SU INCORPORACIÓN A LA MASA DE RESIDUOS #LIMPIEZA DEL ENTORNO DEL VERTEDERO E INCORPORACIÓN A LA MASA DE RESIDUOS #ADECUACIÓN DE LA MASA DE RESIDUOS, NIVELACIÓN DE SUPERFICIES Y ESTABILIZACIÓN FÍSICA PARA ASEGURAR LA ESTABILIDAD DE LOS TALUDES #COBERTURA DEL ÁREA DE VERTIDO MEDIANTE UNA BARRERA IMPERMEABLE QUE EVITE LA ENTRADA DE AGUA LA MASA DE RESIDUOS Y QUE EN SU CAPA EXTERNA SOPORTE VEGETACIÓN. #GESTIÓN DE AGUAS SUPERFICIALES DE LLUVIA SOBRE LA CAPA DE COBERTURA Y DE LAS AGUAS DE ESCORRENTÍA SUPERFICIALES. #GESTIÓN DE LIXIVIADOS. #RECOGIDA Y TRATAMIENTO DE LOS GASES QUE SE GENEREN POR LA DESCOMPOSICIÓN DE LOS RESIDUOS. DIRECCIÓN DE OBRA Y COORDINADOR DE SEGURIDAD Y SALUD. DEBIDO A LAS ACTUACIONES QUE REPRESENTA LA EJECUCIÓN DE LAS OBRAS DEL SELLADO Y A LA DIVERSIDAD Y ESPECIALIZACIÓN DE LOS TRABAJOS, SE HACE NECESARIA UNA DEDICACIÓN COMPLETA E INTENSA PARA LA DIRECCIÓN DE OBRA QUE POSIBILITE EL AJUSTE ENTRE LA EJECUCIÓN DEL PROYECTO Y LAS FASES Y PLAZOS PREVISTOS PARA SU EJECUCIÓN. (Spanish)
    0 references
    THE DECOMMISSIONING AND SEALING PLAN CONSISTS OF THE DEFINITION OF A WORK FOR THE CONDITIONING AND SEALING OF THE LANDFILL AREAS, WHICH MUST MEET THE FOLLOWING REQUIREMENTS: REDUCTION OF ENVIRONMENTAL RISKS, REDUCTION OF HEALTH RISKS, REGULARISATION OF SURFACES TO CONTROL SLOPE INSTABILITY, REDUCTION OF DESTRUCTIVE ACTION DUE TO EROSION, ABRASION, ARROYADEROS, ETC. AND LIMITATION OF LANDFILL SATURATION. THESE CONDITIONS ARE LAID DOWN UNDER THE PREMISE OF PROTECTING THE ENVIRONMENT, IN PARTICULAR AS REGARDS THE POSSIBLE POLLUTION OR ALTERATION OF WATER, OR NATURAL AND CULTURAL GOODS, AND THE SAFETY OF PERSONS, WITH A SPECIFIC IMPACT ON THE STABILITY OF THE AREAS. THE PROPOSED ACTION IS DIVIDED INTO: — DRAFTING OF THE PROJECT FOR THE EXECUTION OF THE SEALING WORK AND GEOLOGICAL STUDY OF THE GROUND TO DETERMINE THE STABILITY OF THE SITE. LANDFILL SEALING WORKS. THESE WORKS SHALL CONSIST OF: #RETIRADA OF BULKY SURFACES AND TRANSPORT TO CONTROLLED LANDFILL AND/OR TREATMENT FOR INCORPORATION INTO THE WASTE MASS #LIMPIEZA OF THE LANDFILL ENVIRONMENT AND INCORPORATION INTO THE WASTE MASS #ADECUACIÓN OF THE WASTE MASS, SURFACE LEVELING AND PHYSICAL STABILISATION TO ENSURE THE STABILITY OF SLOPES #COBERTURA OF THE LANDFILL AREA BY MEANS OF AN IMPERMEABLE BARRIER THAT PREVENTS THE ENTRY OF WATER FROM THE WASTE MASS AND THAT IN ITS OUTER LAYER SUPPORTS VEGETATION. #GESTIÓN OF RAIN SURFACE WATER OVER THE COVER LAYER AND SURFACE RUNOFF WATERS. #GESTIÓN LEACHATE. #RECOGIDA AND TREATMENT OF GASES GENERATED BY THE DECOMPOSITION OF WASTE. CONSTRUCTION MANAGEMENT AND SAFETY AND HEALTH COORDINATOR. DUE TO THE ACTIONS REPRESENTED BY THE EXECUTION OF THE WORKS OF THE SEALING AND THE DIVERSITY AND SPECIALISATION OF THE WORKS, A FULL AND INTENSE DEDICATION IS NECESSARY FOR THE MANAGEMENT OF THE WORKS THAT ALLOWS THE ADJUSTMENT BETWEEN THE EXECUTION OF THE PROJECT AND THE PHASES AND DEADLINES FORESEEN FOR ITS EXECUTION. (English)
    14 October 2021
    0 references
    Beas de Guadix
    0 references

    Identifiers

    A1651089M30010
    0 references