REHABILITATION OF TONDELA SECONDARY SCHOOL PHASE 1 (Q2870983)

From EU Knowledge Graph
Revision as of 14:28, 21 October 2021 by DG Regio (talk | contribs) (‎Removed claim: budget (P474): 778,416.0 euro)
Jump to navigation Jump to search
Project Q2870983 in Portugal
Language Label Description Also known as
English
REHABILITATION OF TONDELA SECONDARY SCHOOL PHASE 1
Project Q2870983 in Portugal

    Statements

    0 references
    12 February 2017
    0 references
    31 December 2018
    0 references
    MUNICÍPIO DE TONDELA
    0 references
    0 references

    40°30'50.65"N, 8°4'47.03"W
    0 references
    A operação objeto da candidatura que se apresenta visa a reabilitação da Escola Secundária de Tondela (Blocos C, C, E e F e espaços exteriores adjacentes), no sentido de colmatar as situações de desgaste material do edificado, retificando patologias e amenizando os sintomas de evidente degradação, mas também, procurando adequar as estruturas existentes às novas necessidades que o conceito de ensino, em permanente mutação, exige. (Portuguese)
    0 references
    The operation object of the application that is presented aims at the rehabilitation of the Secondary School of Tondela (Blocks C, C, E and F and adjacent exterior spaces), in order to fill the situations of material wear of the building, rectifying pathologies and mitigating the symptoms of evident degradation, but also, seeking to adapt the existing structures to the new needs that the concept of teaching, constantly changing, requires. (English)
    7 July 2021
    0 references
    Tondela, União das freguesias de Tondela e Nandufe
    0 references

    Identifiers

    CENTRO-03-5673-FEDER-000061
    0 references