Requalification of the School Park – 3rd Phase (Q2881925)

From EU Knowledge Graph
Revision as of 13:10, 20 October 2021 by DG Regio (talk | contribs) (‎Removed claim: budget (P474): 449,084.85 euro)
Jump to navigation Jump to search
Project Q2881925 in Portugal
Language Label Description Also known as
English
Requalification of the School Park – 3rd Phase
Project Q2881925 in Portugal

    Statements

    0 references
    1 March 2018
    0 references
    30 January 2020
    0 references
    MUNICIPIO DE SETUBAL
    0 references
    0 references

    38°31'41.99"N, 8°51'56.99"W
    0 references
    Considerando a realidade do Parque Escolar concelhio torna-se imprescindível a realização de intervenções a nível de reabilitação das infraestruturas, a reparação de infiltrações, fissuras, pinturas de tetos e paredes, a remodelação de cozinhas e refeitórios assim como de instalações sanitárias, espaços exteriores e remoção de fibrocimento. (Portuguese)
    0 references
    Considering the reality of the Municipal School Park, it is essential to carry out interventions in the level of infrastructure rehabilitation, the repair of infiltrations, cracks, ceiling and wall paintings, the remodeling of kitchens and cafeterias as well as sanitary facilities, outdoor spaces and removal of fibrocement. (English)
    7 July 2021
    0 references
    Setúbal, Setúbal (São Sebastião)
    0 references

    Identifiers

    LISBOA-07-5673-FEDER-000053
    0 references