Water supply infrastructure in Castro Marim: Central subsystem (Q2982415)

From EU Knowledge Graph
Revision as of 12:27, 20 October 2021 by DG Regio (talk | contribs) (‎Removed claim: budget (P474): 3,000,000.0 euro)
Jump to navigation Jump to search
Project Q2982415 in Portugal
Language Label Description Also known as
English
Water supply infrastructure in Castro Marim: Central subsystem
Project Q2982415 in Portugal

    Statements

    0 references
    0 references
    21 March 2016
    0 references
    31 March 2021
    0 references
    MUNICÍPIO DE CASTRO MARIM
    0 references
    0 references
    0 references

    37°13'4.58"N, 7°26'44.56"W
    0 references
    A presente operação consiste na execução do Subsistema Central de Abastecimento de Água do concelho de Castro Marim, que permitirá o abastecimento de água em quantidade e qualidade às populações ainda não servidas.A intervenção permitirá a articulação entre a vertente “em alta” e a vertente “em baixa”, configurando as infra-estruturas municipais de modo a permitir a ligação eficaz aos Sistemas Multimunicipais de Abastecimento de Águas do Algarve. (Portuguese)
    0 references
    The present operation consists of the implementation of the Central Water Supply Subsystem of the municipality of Castro Marim, which will allow the supply of water in quantity and quality to the populations not yet served.The intervention will allow the articulation between the slope in high and the lower slope, configuring the municipal infrastructure in order to allow the effective connection to the Multimunicipal Water Supply Systems of the Algarve. (English)
    9 July 2021
    0 references
    Castro Marim
    0 references

    Identifiers

    POSEUR-03-2012-FC-000589
    0 references