ENERGY EFFICIENCY IN THE POOL MUNICIPAL DE CASTRO MARIM (Q2857598)

From EU Knowledge Graph
Revision as of 11:07, 20 October 2021 by DG Regio (talk | contribs) (‎Changed an Item: modifying budgets in portugal one item from slovenia)
Jump to navigation Jump to search
Project Q2857598 in Portugal
Language Label Description Also known as
English
ENERGY EFFICIENCY IN THE POOL MUNICIPAL DE CASTRO MARIM
Project Q2857598 in Portugal

    Statements

    0 references
    0 references
    63,403.0 Euro
    0 references
    125,459.0 Euro
    0 references
    50.54 percent
    0 references
    1 January 2019
    0 references
    31 December 2021
    0 references
    MUNICÍPIO DE CASTRO MARIM
    0 references
    0 references

    37°13'4.58"N, 7°26'44.56"W
    0 references
    A operação aposta em medidas que conduzem a 1 diminuição de consumos energéticos no Edifício Piscinas Municipais de Castro Marim, através da substituição de equipamentos obsoletos por outros eficientes, utilização de sistemas solares (térmico) e colocação de isolamento térmico na cobertura. Pretende-se diminuir o impacto energético e carbónico, pela redução de emissões com efeito de estufa. (Portuguese)
    0 references
    The operation focuses on measures that lead to 1 reduction of energy consumption in the Municipal Pools Building of Castro Marim, through the replacement of obsolete equipment by other efficient ones, use of solar systems (thermal) and placement of thermal insulation in the roof. The aim is to reduce the energy and carbon impact by reducing greenhouse emissions. (English)
    6 July 2021
    0 references
    Castro Marim
    0 references

    Identifiers

    ALG-03-1203-FEDER-000025
    0 references