Pedestrian Public Access to the New Door of Treason (Q2863418)

From EU Knowledge Graph
Revision as of 09:16, 20 October 2021 by DG Regio (talk | contribs) (‎Removed claim: budget (P474): 47,903.83 euro)
Jump to navigation Jump to search
Project Q2863418 in Portugal
Language Label Description Also known as
English
Pedestrian Public Access to the New Door of Treason
Project Q2863418 in Portugal

    Statements

    0 references
    1 June 2017
    0 references
    30 December 2019
    0 references
    MUNICÍPIO DE ÉVORA
    0 references
    Q2986425 (Deleted Item)
    0 references

    38°34'30.83"N, 7°54'39.64"W
    0 references
    O Acesso pedonal à Porta da Traição está integrado no Projeto de Requalificação e Reabilitação do Espaço Público da Acrópole de Évora, que se articula com a intervenção no Pátio e Ermida de S. Miguel, promovendo o acesso pedonal. A intervenção consiste na construção de passeio lateral e escadaria ao longo da Rampa de S. Miguel e de um caminho em saibro a partir da Porta da Traição e sobre o afloramento rochoso e repavimentação da Rampa. (Portuguese)
    0 references
    The pedestrian access to the Gate of Traction is integrated into the Requalification and Rehabilitation Project of the Public Space of the Évora Acropolis, which is articulated with the intervention in the Patio and Hermitage of S. Miguel, promoting pedestrian access. The intervention consists of the construction of a side walk and staircase along the S. Miguel Ramp and a clay path from the Gate of the Treason and on the rocky outcrop and repaviation of the Ramp. (English)
    6 July 2021
    0 references
    Évora, União das freguesias de Évora (São Mamede, Sé, São Pedro e Santo Antão)
    0 references

    Identifiers

    ALT20-04-2316-FEDER-000038
    0 references