Jr JOB 2017 — Comprehensive EP buildings owned by municipalities — Municipality of Radovljica (Q3272195)

From EU Knowledge Graph
Revision as of 08:13, 13 October 2021 by DG Regio (talk | contribs) (‎Changed an Item: Edited by the materialized bot - inferring region from the coordinates)
Jump to navigation Jump to search
Project Q3272195 in Slovakia
Language Label Description Also known as
English
Jr JOB 2017 — Comprehensive EP buildings owned by municipalities — Municipality of Radovljica
Project Q3272195 in Slovakia

    Statements

    0 references
    176,659.83 Euro
    0 references
    1 January 2014
    0 references
    31 December 2018
    0 references
    OBČINA RADOVLJICA
    0 references
    0 references

    46°20'41.03"N, 14°10'27.05"E
    0 references
    4240
    0 references
    Osnovni namen investicijskega projekta je povečanje učinkovitosti rabe energije v lasti in rabi občin za projekt Vrtec Radovljica, v lasti Občine Radovljica. S celovito energetsko sanacijo bo omogočeno izboljšanje in povečanje energetske učinkovitosti, zmanjšani stroški energije in vzdrževanja oz. upravljanja objekta ter zmanjšanja emisij toplogrednih plinov in prašnih delcev. S tem bo izboljšana kvaliteta bivanja in okolja. Glavni cilj investicijskega projekta je v predvidenem obdobju in s predvidenimi finančnimi sredstvi izvesti izbrane ukrepe za celovito energetsko prenovo stavbe, ki bodo izboljšali energetsko učinkovitost stavb, zmanjšali stroške in negativne vplive na okolje. Izvedli bodo naslednje ukrepe: vgradnja termostatskih ventilov, obnova ovoja stavbe in zamenjava sijalk z varčnimi. V okviru izvedenega projekta bodo doseženi naslednji kazalniki učinka: Povečanje proizvodnje energije iz OVE 0 kWh, Letni prihranki končne energije 63.028,00 kWh in instalirana moč OVE 0 kW. (Slovenian)
    0 references
    The main purpose of the investment project is to increase the efficiency of energy use owned and used by municipalities for the project Kindergarten Radovljica, owned by the Municipality of Radovljica. Comprehensive energy remediation will make it possible to improve and increase energy efficiency, reduce energy and maintenance/management costs of the facility, and reduce greenhouse gas and particulate emissions. This will improve the quality of living and the environment. The main objective of the investment project is to implement selected measures for the comprehensive energy renovation of the building over the foreseen period and with the foreseen financial resources, which will improve the energy performance of buildings, reduce costs and negative environmental impacts. They will implement the following measures: installation of thermostatic valves, renovation of the building envelope and replacement of lamps with energy-saving lamps. The implementation of the project will achieve the following output indicators: Increase in energy production from RES 0 kWh, Annual final energy savings 63 028.00 kWh and installed power of RES 0 kW. (English)
    12 October 2021
    0 references

    Identifiers

    OP20.02345
    0 references