Sustainable Urban Mobility Plan and Implementation of Improvement Actions (Q3151418)

From EU Knowledge Graph
Revision as of 15:28, 12 October 2021 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in en: translated_label)
Jump to navigation Jump to search
Project Q3151418 in Spain
Language Label Description Also known as
English
Sustainable Urban Mobility Plan and Implementation of Improvement Actions
Project Q3151418 in Spain

    Statements

    0 references
    46,666,666.4 Euro
    0 references
    58,333,333.0 Euro
    0 references
    80.0 percent
    0 references
    25 September 2018
    0 references
    31 December 2021
    0 references
    AYUNTAMIENTO DE AVILES
    0 references

    43°33'19.58"N, 5°55'20.10"W
    0 references
    33004
    0 references
    En el marco de esta operación se propone la elaboración del Plan de movilidad urbana sostenible y ejecución de medidas de mejora señaladas como necesarias en las zonas del ámbito de la estrategia DUSI, entre las que cabe señalar las siguientes actuaciones recogidas en la_x000D_ tabla. Estas operaciones están incluidas en el borrador del PMUS para su ejecución, aunque por la situación ocurrida desde que se decretó el estado de alarma, no se ha realizado información ni proceso de participación ciudadana previo a su aprobación inicial. Se prevé que al PMUS le queda aún un año de tramitación, lo que no impide que se sigan ejecutando ya las medidas que_x000D_ contiene, algunas ya realizadas en otros ámbitos al concluir el periodo de confinamiento para favorecer el transporte público, y el tránsito peatonal y de vehículos no contaminantes frente a los vehículos privados. _x000D_ MEDIDAS ESTRATÉGICAS: _x000D_ _RESTRICCIONES DE CIRCULACIÓN (nuevas vías peatonales) _MEDIDAS DE CALMADO DE TRÁFICO _x000D_ _ADECUACIÓN DE ITINERARIOS PEATONALES _x000D_ _MEJORA DE SEGURIDAD VIAL EN CRUCES _x000D_ _DESARROLLO DE LA INFRAESTRUCTURA CICLISTA _x000D_ _ACCESIBILIDAD _x000D_ _INSTALACIÓN DE NUEVOS PUNTOS DE PRÉSTAMO Y APARCAMIENTO DE BICICLETAS _x000D_ _ACTUACIONES EN EL TRANSPORTE PÚBLICO _x000D_ _MEDIDAS DE DESCONGESTIÓN (entre otras) (Spanish)
    0 references
    Within the framework of this operation, it is proposed to draw up the Sustainable Urban Mobility Plan and to implement improvement measures identified as necessary in the areas covered by the DUSI strategy, including the following actions set out in the_x000D_ table. These operations are included in the draft SUMP for implementation, although due to the situation since the state of alarm was decreed, no information or citizen participation process has been carried out prior to its initial approval. It is expected that the SUMP will still have one year of processing, which does not prevent the continuation of the measures that_x000D_ contains, some already carried out in other areas at the end of the confinement period to favour public transport, and the transit of pedestrians and clean vehicles over private vehicles. _x000D_ STRATEGIC measures: _x000D_ _CIRCULATION RESTRICTIONS (new pedestrian pathways) _Traffic calming measures _x000D_ _PEathon ITINERARY ADECUATION _x000D_ _VIAL SECURITY MEASURE IN CRUCTS _x000D_ _CICLIST INFRASTRUCTURE DEVELOPMENT _x000D_ _ACCESSIBILITY _x000D_ _INSTALATION OF NEW PRESS POINTS AND BICICLET APPLICATION _x000D_ _ACTUATIONS IN THE PUBLIC TRANSPORT _x000D_ _Decongestion measures (among others) (English)
    12 October 2021
    0 references
    Avilés
    0 references

    Identifiers

    FCL01AS0218
    0 references