Implementation of an energy management system in Dried Fruit Plant (Q3148127)

From EU Knowledge Graph
Revision as of 14:40, 12 October 2021 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in en: translated_label)
Jump to navigation Jump to search
Project Q3148127 in Spain
Language Label Description Also known as
English
Implementation of an energy management system in Dried Fruit Plant
Project Q3148127 in Spain

    Statements

    0 references
    1,730,778.0 Euro
    0 references
    3,461,556.0 Euro
    0 references
    50.0 percent
    0 references
    8 August 2017
    0 references
    2 March 2020
    0 references
    GONZALEZ ENCINAS PEDRO
    0 references
    0 references

    39°23'44.30"N, 0°24'54.29"W
    0 references
    46007
    0 references
    Previamente al desarrollo del siguiente proyecto, se realizo una auditoria energética integral de la Planta de Frutas Desecadas en la que se detectó la inexistencia de un SGE implantado. Mediante la implantación de un Sistema de Gestión Energética se pretende dotar a la planta de las herramientas necesarias para el seguimiento y control del consumo de energía eléctrica o térmica._x000D_ Siendo a su vez una herramienta para el análisis de la información, generación de propuestas de ahorro y ayuda a la planificación en su implantación. (Spanish)
    0 references
    Prior to the development of the next project, a comprehensive energy audit of the dried fruit plant was carried out in which the absence of an implanted GES was detected. Through the implementation of an Energy Management System it is intended to provide the plant with the necessary tools for monitoring and controlling the consumption of electrical or thermal energy._x000D_ It is in turn a tool for the analysis of information, generation of savings proposals and aid to planning in its implementation. (English)
    12 October 2021
    0 references
    Albal
    0 references

    Identifiers

    FN17IND00613
    0 references