Energy saving and efficiency project in industrial energy-consuming equipment and processing plants and energy-consuming auxiliaries and implementation of energy saving verification systems (Q3234455)

From EU Knowledge Graph
Revision as of 12:17, 12 October 2021 by DG Regio (talk | contribs) (‎Changed an Item: Edited by the materialized bot - inferring region from the coordinates)
Jump to navigation Jump to search
Project Q3234455 in Spain
Language Label Description Also known as
English
Energy saving and efficiency project in industrial energy-consuming equipment and processing plants and energy-consuming auxiliaries and implementation of energy saving verification systems
Project Q3234455 in Spain

    Statements

    0 references
    20,657.6 Euro
    0 references
    25,822.0 Euro
    0 references
    80.0 percent
    0 references
    6 July 2017
    0 references
    15 September 2018
    0 references
    ROTOGAL SL
    0 references
    0 references
    0 references

    42°38'46.64"N, 8°53'9.13"W
    0 references
    15011
    0 references
    Sustitución de los siguientes equipos del proceso productivo:_x000D_ _x000D_ 1. Un equipo de soldadura de hilo continuo, y una potencia de 24 kW, por equipo de 12,9 kW_x000D_ 2. Un equipo de soldadura de 12 kW de potencia por un equipo 100% digital y una potencia de 5,5 kW._x000D_ _x000D_ 3. Una enfriadora de líquido por una máquina enfriadora de agua de condensación por aire_x000D_ _x000D_ 4. Un cabezal de corte de la extrusora, de 1,2 kW de potencia, por un nuevo equipo de corte diseñado a medida y una potencia de 1,125 kW._x000D_ Instalación de un programa informático y herramientas para el control y monitorización del gasto energético. (Spanish)
    0 references
    Replacement of the following equipment in the production process: 1.A team of welding of continuous wire, and a power of 24 kW, by equipment of 12.9 kW. 2. A welding equipment of 12 kW of power by a 100% digital equipment and a power of 5.5 kW. 3. A liquid chiller by an air condensing water chiller. 4. A cutting head of the extruder, of 1.2 kW of power, by a new cutting equipment designed to measure and a power of 1,125 kW. Installation of a computer program and tools for the control and monitoring of energy expenditure (English)
    0 references
    Boiro
    0 references

    Identifiers

    048-2018000423
    0 references