No label defined (Q3213644)

From EU Knowledge Graph
Revision as of 15:31, 10 October 2021 by DG Regio (talk | contribs) (‎Changed an Item: Edited by the infer coords bot - inferring coordinates from location)
Jump to navigation Jump to search
Project Q3213644 in Spain
Language Label Description Also known as
English
No label defined
Project Q3213644 in Spain

    Statements

    0 references
    59,128,631.2 Euro
    0 references
    73,910,789.0 Euro
    0 references
    80.0 percent
    0 references
    11 August 2021
    0 references
    11 August 2022
    0 references
    CONSEJERIA DE INFRAESTRUCTURAS, MEDIO AMBIENTE Y CAMBIO CLIMATICO
    0 references
    0 references
    0 references

    43°18'33.41"N, 6°29'31.02"W
    0 references
    33073
    0 references
    El proyecto incluye la ampliación de la red de saneamiento en núcleos de la zona de El Crucero, así como una actuación en el entorno del aliviadero de Ocio, instalación hidráulica previa a la depuradora._x000D_ _x000D_ En la EDAR de Tineo están previstas varias actuaciones como la sustitución de los difusores de los reactores biológicos para mejorar la eficiencia energética y la instalación de equipos de almacenamiento y dosificación de cloruro férrico para asegurar el cumplimiento del límite que pueda establecerse en el futuro en la concentración de fósforo en el efluente._x000D_ _x000D_ Por otro lado, se recogerán los puntos de vertido de Santa Eulalia, Zarracín y Valdarieme para llevarlos hacia un pozo previo al aliviadero de El Crucero, que regula las aguas que se dirigen hacia la EDAR. (Spanish)
    0 references
    The project includes the expansion of the sanitation network in cores of the El Crucero area, as well as an action in the surroundings of the Ocio spillway, a hydraulic installation prior to the treatment plant. Various actions are planned at the Tineo WWTP, such as the replacement of the diffusers of the biological reactors to improve energy efficiency and the installation of ferric chloride storage and dosing equipment to ensure compliance with the limit that may be established in the future in the phosphorus concentration in the effluent. On the other hand, the discharge points of Santa Eulalia, Zarracín and Valdarieme will be collected to take them to a well prior to the El Crucero spillway, which regulates the waters that go to the WWTP. (English)
    0 references
    Tineo
    0 references

    Identifiers

    JS-51/2020
    0 references