Mediterranean Corridor. New direct connection Seville — Malaga/Granada between Almodóvar and La Marota (Q3190775)

From EU Knowledge Graph
Revision as of 11:35, 10 October 2021 by DG Regio (talk | contribs) (‎Changed an Item: Edited by the infer coords bot - inferring coordinates from location)
Jump to navigation Jump to search
Project Q3190775 in Spain
Language Label Description Also known as
English
Mediterranean Corridor. New direct connection Seville — Malaga/Granada between Almodóvar and La Marota
Project Q3190775 in Spain

    Statements

    0 references
    1,923,664,562.4 Euro
    0 references
    2,404,580,703.0 Euro
    0 references
    80.0 percent
    0 references
    1 January 2014
    0 references
    31 December 2023
    0 references
    ADIF-ALTA VELOCIDAD
    0 references
    0 references

    37°48'40.50"N, 5°1'10.09"W
    0 references
    14005
    0 references
    El objeto es la conexión de las Líneas de Alta Velocidad Madrid – Sevilla y Córdoba – Málaga mediante un ramal directo de enlace (bypass) en el entorno de la población de Almodóvar del Río, de modo que se evite el recorrido adicional hasta Córdoba y la inversión de marcha en la estación, disminuyendo por tanto los tiempos de viaje actuales en la relación Sevilla – Málaga y en la futura Sevilla – Granada, a través de la red de Alta Velocidad. (Spanish)
    0 references
    The object is the connection between High Speed Lines Madrid - Seville and Córdoba - Málaga with a bypass in the surroundings of Almodóvar del Río, in order to avoid the additional rail route to Córdoba, decreasing current travel times in the Seville - Malaga connection and in the future Seville - Granada connection, through the High Speed railway network. (English)
    0 references
    Almodóvar del Río
    0 references

    Identifiers

    Bifurcacion_La_Marota
    0 references