Overland passage over the bypass road of Oradea in the area of Ciheiului Street, Oradea, Bihor County- Phase II (Q3099101)

From EU Knowledge Graph
Revision as of 16:47, 9 October 2021 by DG Regio (talk | contribs) (‎Changed an Item: Edited by the materialized bot - inferring region from the coordinates)
Jump to navigation Jump to search
Project Q3099101 in Romania
Language Label Description Also known as
English
Overland passage over the bypass road of Oradea in the area of Ciheiului Street, Oradea, Bihor County- Phase II
Project Q3099101 in Romania

    Statements

    0 references
    0 references
    12,995,867.97 Romanian Leu
    0 references
    2,599,173.5940000005 Euro
    13 September 2021
    0 references
    15,289,256.45 Romanian Leu
    0 references
    3,057,851.29 Euro
    13 September 2021
    0 references
    85.0 percent
    0 references
    14 May 2015
    0 references
    20 October 2018
    0 references
    COMPANIA NAŢIONALĂ DE ADMINISTRARE A INFRASTRUCTURII RUTIERE S.A./Departament Documentatii Obtinere Fonduri Externe
    0 references

    47°3'17.71"N, 21°55'42.67"E
    0 references
    Prin POIM se urmăreşte extinderea infrastructurii de transport rutier amplasate pe reţeaua TEN-T globala (Comprehensive), prin completarea sectiunilor a căror construcţie a fost demarată în perioada de programare 2007-2013 şi a celor care vor fi stabilite prin MPGT, asigurând dezvoltarea în continuare a rețelei definite. Proiectul va conduce, în primul rând, la economii de timp în transportul rutier de mărfuri şi călători între regiunile României și Europa Centrală, de Vest și de Sud ca urmare a eliminării blocajelor pe rutele vizate, asigurând creșterea mobilității. Aceste rezultate vor contibui la promovarea competitivităţii economice, prin îmbunătăţirea condiţiilor în transportul rutier de mărfuri şi călători, şi la reducerea emisiilor poluante prin eliminarea/ reducerea blocajelor de trafic prin reducerea duratelor de transport. Realizarea proiectului duce la crearea unei cai de comunicatie moderne cu implicatii in dezvoltarea regionala a zonei, a fluidizarii traficului, micsorarea timpilor de parcurs, scaderea poluarii la toate nivelele in zonele prezent tranzitate, reducerea numarului de accidente rutiere si victime omenesti. Ca urmare a implementarii indicatorilor de fazare, proiectul va contribui la realizarea obiectivului general al proiectului (pasaj nou in lungime totala de 33,00 m cu o latime de 15,73 m, bretele de acces si benzi de accelerare-decelerare in lungime de 2.463 m si rampe in lungime de 450 m), respectiv la indicatorii prestabiliti de realizare CO13A - Drumuri: lungimea totala a drumurilor nou construite si CO13 - Lungime totala drumuri nou construite (FEDR). (Romanian)
    0 references
    The LIOP aims to expand the road transport infrastructure located on the comprehensive TEN-T network (Comprehensive) by complementing the sections which started in the 2007-2013 programming period and those which will be established by the MPGT, ensuring the further development of the defined network. The project will primarily lead to time savings in road freight and passenger transport between the regions of Romania and Central, Western and Southern Europe as a result of the removal of bottlenecks on the targeted routes, ensuring increased mobility. These results will contribute to promoting economic competitiveness by improving conditions in road freight and passenger transport and reducing pollutant emissions by removing/reduction of traffic bottlenecks by reducing transport times. The realisation of the project leads to the creation of a modern communication path with implications in the regional development of the area, of the traffic fluidisation, the reduction of journey times, the decrease of pollution at all levels in the areas currently transited, the reduction of the number of road accidents and human victims. As a result of the implementation of the phase indicators, the project will contribute to the achievement of the general objective of the project (new pass in total length of 33.00 m with a width of 15.73 m, access straps and acceleration-deceleration strips in length of 2.463 m and ramps in length of 450 m), respectively to the predetermined output indicators CO13A – Roads: total length of newly built roads and CO13 – Total length of newly built roads (ERDF). (English)
    16 September 2021
    0 references
    Municipiul Oradea, Romania
    0 references

    Identifiers

    111438
    0 references