No label defined (Q3213864)

From EU Knowledge Graph
Revision as of 03:28, 9 October 2021 by DG Regio (talk | contribs) (‎Created a new Item)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Project 0.6262244742736984 in Spain
Language Label Description Also known as
English
No label defined
Project 0.6262244742736984 in Spain

    Statements

    0 references
    49,278,718.4 Euro
    0 references
    61,598,398.0 Euro
    0 references
    80.0 percent
    0 references
    13 September 2021
    0 references
    13 September 2022
    0 references
    CONSEJERIA DE INFRAESTRUCTURAS, MEDIO AMBIENTE Y CAMBIO CLIMATICO
    0 references
    0 references
    0 references
    33060
    0 references
    Saneamiento de los núcleos de Piñera, Escobio, El Nietu y el valle de Lanteru (San Martín del Rey Aurelio) conectando a un colector general del sistema de saneamiento del alto Nalón, al que pertenece la EDAR de Frieres._x000D_ _x000D_ En Piñera y en Escobio se renovará la red, que actualmente no alcanza a todas las viviendas. Las aguas residuales se incorporarán al sistema de depuración de Frieres desde el bombeo auxiliar del Museo de la Minería. En el núcleo de El Nietu se construirá otra red que se conectará al colector general._x000D_ _x000D_ Se ejecutará, además, el último tramo del colector de Lanteru, que tendrá unos 500 metros de longitud y se conectará a todas las viviendas del valle. (Spanish)
    0 references
    Works aim is to connect Piñera, Escobio, El Nietu and Lanteru valley (San Martín del Rey Aurelio) sanitation to general manifold of the sanitation system of high section Nalón river, which is integrated in WWTP of Frieres. In Piñera and Escobio, the network, which does not reach all its housing, is going to be renewed. Waste water is going to be incorporated to waste water system of Frieres plant through the auxiliary pumping of Mining Museum. In El Nietu another network to be connected to general manifold is going to be constructed. Also it is going to be constructed the last section of the Lanteru manifold, which is going to have a 500 meters length and will be connect all valley housing. (English)
    0 references
    San Martín del Rey Aurelio
    0 references

    Identifiers

    JS-50/2020
    0 references