Adaptation actions in the urban environment and improvements in green infrastructure (Q3141515)

From EU Knowledge Graph
Revision as of 02:08, 9 October 2021 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in en: translated_label)
Jump to navigation Jump to search
Project Q3141515 in Spain
Language Label Description Also known as
English
Adaptation actions in the urban environment and improvements in green infrastructure
Project Q3141515 in Spain

    Statements

    0 references
    319,904.0 Euro
    0 references
    399,880.0 Euro
    0 references
    80.0 percent
    0 references
    1 January 2021
    0 references
    31 December 2023
    0 references
    AYUNTAMIENTO DE MAIRENA DEL ALCOR
    0 references
    0 references
    41058
    0 references
    Las acciones previstas son:_x000D_ _x000D_ 1. Ejecución de itinerario reservado al peatón o la bici en el borde suroeste del municipio, en el espacio limítrofe del suelo urbano con la zona protegida del Escarpe para evitar la erosión de este espacio. Las acciones para desarrollar en el marco de esta actuación son limpieza y desbroce previo del terreno, preparación del terreno y ejecución de los SUDS, explanación del terreno y ejecución de la pasarela peatonal y ciclista y reforestación de la zona afectada._x000D_ 2. Creación de una red de espacios de capacitación en cultura del reciclaje y economía verde a través de un micropunto limpio e itinerarios de sensibilización del cuidado del entorno urbano sostenible a lo largo del camino Zapata. Con esta actuación se pretende dar continuidad y poner en práctica las actuaciones relacionadas con los proyectos del Aula de la Naturaleza (Bioaula) de la LA4. Además, esta actuación se realizará en el entorno del futuro centro social y asistencial que será financiado en el marco de la estrategia (OT 9) cuyo itinerario recorrerá la pasarela peatonal del Camino Zapata. Para la ejecución del micropunto limpio será necesaria la adecuación y regeneración del terreno usando para ello un sistema muy innovador basado en la instalación de Pavimentos fotocatalíticos_x000D_ 3. Actividades de sensibilización relacionada con medidas de adaptación al cambio climático y la protección del medio ambiente. (Spanish)
    0 references
    The planned actions are:_x000D_ _x000D_ 1. Execution of the itinerary reserved for pedestrians or bicycles on the southwestern edge of the municipality, in the border area of ¿¿the urban land with the Escarpe protected area to avoid the erosion of this space. The actions to be carried out within the framework of this action are cleaning and previous clearing of the land, preparation of the land and execution of the SUDS, leveling of the land and execution of the pedestrian and cycling walkway and reforestation of the affected area._x000D_ 2. Creation of a network of training spaces in the culture of recycling and the green economy through a clean micro-point and itineraries to raise awareness of the care of the sustainable urban environment along the Zapata road. This action is intended to give continuity and put into practice the actions related to the projects of the Nature Classroom (Bioaula) of LA4. In addition, this action will be carried out in the surroundings of the future social and assistance center that will be financed within the framework of the strategy (OT 9) whose itinerary will run along the pedestrian walkway of the Zapata Trail. For the execution of the clean micro-dot, the adaptation and regeneration of the land will be necessary, using a very innovative system based on the installation of photocatalytic pavements._x000D_ 3. Awareness activities related to measures for adaptation to climate change and protection of the environment. (English)
    0 references
    Mairena del Alcor
    0 references

    Identifiers

    FCL3AN11803
    0 references