Improvement of the energy performance of the PCA Chelytic 2/II, Třeboň (Q73879)

From EU Knowledge Graph
Revision as of 20:07, 26 February 2020 by DG Regio (talk | contribs) (‎Created claim: summary (P836): The “Třeboňský kapr” project deals with the energy-saving renovation of a public building, the nursing home. the project aims to reduce final energy consumption and to reduce the consumption of non-renewable primary energy. among the main activities of the project are: — insulation of the building envelope, — replacement of the building envelope, — replacement of heat sources for heating and preparation of hot water. the project does not constit...)
Jump to navigation Jump to search
Project in Czech Republic financed by DG Regio
Language Label Description Also known as
English
Improvement of the energy performance of the PCA Chelytic 2/II, Třeboň
Project in Czech Republic financed by DG Regio

    Statements

    0 references
    6,100,549.5 Czech koruna
    0 references
    244,021.98 Euro
    10 January 2020
    0 references
    12,201,099.0 Czech koruna
    0 references
    488,043.96 Euro
    10 January 2020
    0 references
    50 percent
    0 references
    15 October 2020
    0 references
    Město Třeboň
    0 references
    0 references

    49°1'12.61"N, 14°45'44.53"E
    0 references
    37901
    0 references
    Projekt Města Třeboň řeší energeticky úspornou renovaci veřejné budovy, domu s pečovatelskou službou.Cílem projektu je snížit konečnou spotřebu energie a snížit spotřebu neobnovitelné primární energie.Mezi hlavní aktivity projektu patří:- zateplení obvodového pláště budovy,- výměna otvorových výplní,- výměna zdroje tepla pro vytápění a přípravu teplé užitkové vody.Projekt nezakládá veřejnou podporu (blíže viz kapitola Jaká existují rizika projektu?). (Czech)
    0 references
    The “Třeboňský kapr” project deals with the energy-saving renovation of a public building, the nursing home. the project aims to reduce final energy consumption and to reduce the consumption of non-renewable primary energy. among the main activities of the project are: — insulation of the building envelope, — replacement of the building envelope, — replacement of heat sources for heating and preparation of hot water. the project does not constitute public aid (see chapter What are the risks of the project?). (English)
    0 references

    Identifiers

    CZ.05.5.18/0.0/0.0/18_100/0009272
    0 references