Revision as of 19:57, 26 February 2020 by DG Regio (talk | contribs) (‎Created claim: summary (P836): The purpose of the project is the construction of I/11 in category S 24,5/100, in category S 11,099, in the order of km (construction I/11 Neory — Oldřichovice 4.860 km and construction I/11 Oldrich — Bystrice 6.239 km), two lanes in each direction and an extra-level connection of roads. The newly built I/11 road in the Neory — Oldřichovice — Bystřice, is part of the definitive solution of the link between the D48 motorway and the Slovak Republi...)
Jump to navigation Jump to search
Project in Czech Republic financed by DG Regio
Language Label Description Also known as
English
I/11 road Nebors — Oldřichovice — Bystrice (2nd phase) _1
Project in Czech Republic financed by DG Regio

    Statements

    0 references
    1,825,092,046.05 Czech koruna
    0 references
    73,003,681.842 Euro
    10 January 2020
    0 references
    2,232,277,930.0 Czech koruna
    0 references
    89,291,117.2 Euro
    10 January 2020
    0 references
    81.759176199444 percent
    0 references
    1 January 2016
    0 references
    30 November 2019
    0 references
    Ředitelství silnic a dálnic ČR
    0 references

    50°2'57.91"N, 14°26'32.86"E
    0 references
    14000
    0 references
    Předmětem projektu je výstavba přeložky silnice I/11 v kategorii S 24,5/100 v celk. délce hl. trasy 11,099 km (stavba I/11 Nebory - Oldřichovice 4,860 km a stavba I/11 Oldřichovice - Bystřice 6,239 km), o dvou jízdních pruzích v každém směru a mimoúrovňovým napojením křižujících komunikací. Nově budovaná silnice I/11 v úseku Nebory - Oldřichovice - Bystřice je součástí definitivního řešení propojení dálnice D48 se Slovenskou republikou a VI. Evropského dopravního koridoru po silnici I/68 a I/11. (Czech)
    0 references
    The purpose of the project is the construction of I/11 in category S 24,5/100, in category S 11,099, in the order of km (construction I/11 Neory — Oldřichovice 4.860 km and construction I/11 Oldrich — Bystrice 6.239 km), two lanes in each direction and an extra-level connection of roads. The newly built I/11 road in the Neory — Oldřichovice — Bystřice, is part of the definitive solution of the link between the D48 motorway and the Slovak Republic and the GOI. The European transport corridor by road I/68 and I/11. (English)