Elaboration of technical and economic documentation for the express road Buzau – Focșani (Q3098948)

From EU Knowledge Graph
Revision as of 13:14, 8 October 2021 by DG Regio (talk | contribs) (‎Changed an Item: Edited by the infer coords bot - inferring coordinates from location)
Jump to navigation Jump to search
Project Q3098948 in Romania
Language Label Description Also known as
English
Elaboration of technical and economic documentation for the express road Buzau – Focșani
Project Q3098948 in Romania

    Statements

    0 references
    12,718,230.4 Romanian Leu
    0 references
    2,543,646.08 Euro
    13 September 2021
    0 references
    14,962,624.01 Romanian Leu
    0 references
    2,992,524.802 Euro
    13 September 2021
    0 references
    85.0 percent
    0 references
    12 November 2018
    0 references
    30 December 2021
    0 references
    COMPANIA NAŢIONALĂ DE ADMINISTRARE A INFRASTRUCTURII RUTIERE S.A./Departament Documentatii Obtinere Fonduri Externe
    0 references

    45°16'9.34"N, 26°46'29.35"E
    0 references

    45°41'50.17"N, 27°11'8.48"E
    0 references
    Obiectivul general al proiectului, ca parte din reteaua TEN-T, este imbunatatirea competitivitatii economice a României prin dezvoltarea infrastructurii de transport care faciliteaza integrarea economica in UE, contribuind astfel la dezvoltarea pietii interne cu scopul de a creea conditiile pentru cresterea volumului investitiilor, promovarea transportului durabil si a coeziunii in reteaua de drumuri europene. Realizarea prezentului proiect - faza Studiu de Fezabilitate si Proiect Tehnic al tronsonului de drum de mare viteza cuprins intre Buzau - Focsani contribuie la indicatorul de rezultat 2S81 – Cerere de finanțare transmisă, spre analiză și aprobare la Organismul Independent pentru Evaluare. (Romanian)
    0 references
    The general objective of the project, as part of the TEN-T network, is to improve Romania’s economic competitiveness by developing transport infrastructure that facilitates economic integration in the EU, thus contributing to the development of the internal market in order to create the conditions for increasing the volume of investments, promoting sustainable transport and cohesion in the European road network. The realisation of this project – Phase Feasibility Study and Technical Project of the high-speed road section between Buzau – Focsani contributes to the result indicator 2S81 – Application for funding submitted for analysis and approval to the Independent Body for Evaluation. (English)
    16 September 2021
    0 references
    Municipiul Buzău, Romania
    0 references
    Municipiul Focşani, Romania
    0 references

    Identifiers

    115750
    0 references